aroa~caeaxx
<br />The sxit,ds rowdily accessible to employos; 9
<br />Candles are used in lighting undergramd,
<br />STATISTICS
<br />The average tonnage is I76 tans par month.
<br />tal rn~mbor feet in shafts, 528, cost per foot X20,00.
<br />tal number of fast in drifts or levals, 823, cost por foot X7,00
<br />tal number of feet in winzos and raises,I45, coat per foot $7.00
<br />tal numver Of' Poet in developement IH94.
<br />The following is ,a list of men employed, with their wage and
<br />length of shift;- ''
<br />~
<br />IO machine dr.tllmon , $54,00 for 8 hour shift, ~
<br />2 miners. $3.00 ". g ~~ „ ~,
<br />~ I timbermon, ^~3,Bp '~ g ~~ ~~
<br />!, 2 helpers, $63,00 " 8 " n
<br />~
<br />' 8 trrmnmers, &%3,00 " 8 " "
<br />''
<br />3. ors-sorters, Sn3,00 " 8 ° ~ " ~ i~~
<br />!,
<br />2 top-man, Sd3,00 " 8 " ~,
<br />"
<br />I
<br />~
<br />2 engineers, X4,00 " 8 ° ~
<br />~
<br />" ~
<br />
<br />T blacksmiths,
<br />X4,00
<br />°
<br />8
<br />" ,
<br />" j' '.
<br />~ ~
<br />~~~' Average numuor of men ou ti;loyod for the year 30; 22. under-
<br />1
<br />~~
<br />,ground and 8 on the surface. ~I
<br />(Cost of coal X55.50 per ton,uverag~e core per mouth y6330,00,
<br />',Cost of timber @d26,00 pier M,avorage cost por month ~6C,CC,
<br />.'Cost of stool 8 I/?, cents po'r pound,avor,cost per month X5,00,
<br />'Cost of o11 95 coots per gallon,avox~age cost per month $5,00,
<br />'!Cost oP powder ~I3,CC per cwt„ average cost por month $900,00,
<br />Tho average assay value ore per. ton is 56A0,00,
<br />The cost per ton mining ot.' oro is X63,00,
<br />The coot of transporting oro by wragon is 55 cents und,rail-
<br />!road transportation Bp9,50,
<br />
|