Laserfiche WebLink
!III <br />.-76A7CR061[7f~6r.. _.. 9 d ~ '~ <br />Tho,,ahaft is divided into 3 compartments and Sa <br />provided <br />'.with ladder-way,Tho ladders are accessible, The ladder--way con- <br />ic <br />Itaina air;pipea. l <br />Landings, not to exceed 20 feet apart, era not provided in <br />7.adda~'-waY. <br />~, Thera are winzes .ox! man-ways connecting levels, <br />At, .least ono man-way is kept in repair and equipped with <br />laddera, <br />'~, The mitla has morn than one exit f.'or amployos,NTOm the 6th, tl~!I~ <br />levo]. through the Isaualle and Burns shafts and from the 7th,leval <br />to the Isabelle, <br />Candles are used in lighting underground, i~~l',II <br />'. ~ 3TATIS:PICS, <br />Tho average tonnage per mohth is 425 tons, <br />II'COtal no, of fact in shafts, rH00,cost per foot 5640,00, <br />Total no, of foot Sn drifts or lavals,I500,cost par foot $8,00, <br />'Total no, of fact in cross-cuts, 200, cost par toot SP7,,00. <br />Total no, of fact in winzas and .rai.sas~acost par t'oot,i'~7.00, <br />Total no, of foot Srx dava.Lopamant,382b, <br />Stopped work Jul,v Ist„I;io3. <br />'Che following is a list of the roan omployad,thelr wage and <br />length of shift:- <br />I2 rnachlna dri:Llmen, 54, U0 for d hour shift, <br />8 machi no halpara, 5o:i. 50 " H " " <br />2 timbarmen, 563,50 " H " " <br />9 trammers, Y63,00 ° H " " , <br />9~ ore Oor.ters, Sp'i,00 " H " " <br />3 top-man, $3.00 ^ H " " , <br />3 angineera, $4,00 " H " " , <br />3 flromon, 563.50 " H " " <br />2 blacksmiths, SD 4. 00 " 8 " <br />I blacksmith hal'par, 563,50 " H " <br />I foreman, $8.00 <br />IoPfiea hale, ^3,00 <br />Average numuar o.f mnu amployari .Cor the year 4?; ?5 under- <br />ground and I7 on srmtaca. <br />Cost of coal 8p5,'Y5 par' ton,uvarF,ga coot par mo,$700,00, <br />Coat o.k' timbar,$24,00 her M. " .. .. .. 8X00.00. <br />Coat of ateal,H I/4 oautO par lU, " " ° ~~~ '• '~ <br />Cost of o11,2tioants to 65 cents par gvxl. " " Sd 7.OU III <br />QOHt Of powder,~I2.45 C?ar Cwt,avaraga COOL" " X800,00 !~ Y <br />Average assay value era par ton i;rCH.00,~ <br />Coot per ton transportdng,;,;oro inoluding traatinant ~CH,b0. <br />W <br />