<br />~~, The mine has morn then one oxit for em1iloyos,From tho 4th,
<br />lovel to (3lorietta shaft and through main shaft, Tha exit is
<br />poor,
<br />The systam employed in lighting is N;lectrie on stations
<br />'and candlarl 1n stopes,
<br />HTATISTICS,
<br />', ,'Cho aver. age tonnage per month is 200 tm7s,
<br />'Dotal nuuWer of f>at in shaft 620, cost par foot $20,00,
<br />(Total number of fact in drifts or lovels,about 2500, cost par
<br />',foot 5~~,00,
<br />To891 nwnuar of fact in cross-cuts 600, cost par foot $6, U0,
<br />'Total number of fast jn winzes and re.isos 250; cost por ft',$I0;00,.
<br />,Tot&.1 number of feat in developamant 3970,
<br />~, 'Che .following list is the nwnuar of men omployod,thair
<br />wage and longth of shift;-
<br />-3:~nw,chitio-drill-wwn, m4,00 for& hour shift,
<br />'I timllerman, $3.50 " 8 " "
<br />'.3 trammers;~ -~ $3,00 " 8 " "
<br />2 top-man, $3.50 " 8 " „
<br />'I angineer, SS9.00 " 8 " " ,
<br />I sitperintondant, S15,UU
<br />The avsraga nwnuar oP ~~u,n employed for the year II, 7
<br />underground and A on tha .simf'ace.
<br />Cost of fixal,coal,5'5,00 per ton,avuraga cost par mo,S6T50,00,
<br />..Cost o.P timber, lagging, 5o !y: stalls yPI.OU aach," "5643,00,
<br />',Cost of oi1,9-0cents 1,or gallon,avarage cost per ino,$4,OU,
<br />'Cost o.f powdor,5y'rI,75 cwt,avar:igia cost par mo, $2?.0,00,
<br />Tha ava:rage assay vaLto of oro por ton is X40,00,
<br />Cost par ton mining ore $13.00.
<br />Cost per ton traatmant and transporting ora 569,`50,