Laserfiche WebLink
(2) <br />xoisting. <br />game as reports of 1912-13. <br />Mine methods-Timbering. <br />same as reports of i912-13.. <br />~i <br />i <br />Underground tramming.Drainage,and Ventilation. <br />~~ <br />Same aA reports of 1912-13.Lighting underground,eleotrioity,and I. <br />oandles. ; <br /> e <br />Statiatios. <br />Average tonnage per month:-?000.-Orals tonnago per year:~4.000 <br />Development. <br />No.oP feat in inoline:-1280.-Coat per foot:-;15.®0. <br /> <br />" „ " „ levels:-6500.- ~ „ " :-~s.oo. <br />„ „ „ M raises:-3oo.- .-18.uo. j <br />Total No.of feet in development:-8000. ~ , <br />Ken employed. ~I <br />4 Maohine drillmen. 14.00. per. day. 8 hour shift. ~I, <br /> <br />„ „ 8 " „ <br />x Trammers. 13.00. <br />2 Topmen. 13.50• " " 8 " " ~~ <br />I Laborer. 13.00. " " 8 " " !~'iI ',4 <br /> <br />44.00. " " Y " " • <br />I Engineer. <br />~~ <br /> <br />~ <br />" „ B <br />n n <br />I Blaoksmith. 44.00• I <br /> <br />~~I . <br /> <br />! <br /> <br />" xelp. t3.5o. " „ s ~~ ~~ <br />I <br />13.50. " „ ~ „ " <br />IS ldiilmen. <br />''~ <br /> ~: <br />~'', <br />Annual. <br />I Supt . ~ t <br />Average No.of men employed for the roar:-40. ~~: <br />Cost. <br />Cost of fuel,•'-14.25 per ton.-Average oost per month:-1150• <br />• , <br />„ n „ " :-0140. '. ~~ <br />" " timber 116.per I000. : <br />~ <br />" " " " •-1300. I ~, <br />ex lb. <br />" " powder 15 ota.P i <br />i~. <br />value of ore per ton:-517.00 <br />Average assay <br />I, <br />I i,y <br />• <br />~ <br />Coat per ton mining ore:-11.25• , <br />: <br />eatment:-EI.25• <br />" " t <br />r <br />„ f <br /> <br />rtation:-12.00• ;, <br />,; <br />" " " transpo <br />General remarks. 1;i3. <br /> C• <br />same as reports of 1912-i3. <br /> <br />