Laserfiche WebLink
II <br />i+ncky iSo on -- 3 <br />S T A T I S T I C S <br />Total number of feet in drifts, 3500. 10.00 per ft. <br />Total number of feet in crosscuts 500. $15.00 per ft. <br />Total number of feet in raises 500. 12.00 per ft. <br />Total number of feet in development 4500. <br />Cost of feel, y8.50 <br />" " steel 5.00 <br />po~rder 16¢ per pound <br />Cost of transporting su_:plies to mine. $10.00 per ton. <br />There was very little shippin? done this year. <br />Average tonnage per month none. Doing development work. <br />Lien employed: <br />2 machine drillmen $4.00 for 8 hours. <br />2 machine helpers 3.50 for 8 hours. <br />1 trammer 3.00 for 8 hours. <br />1 engineer 4.00 for 8 hours. <br />1 foreman 5.00 for 8 hours. <br />1 superintendent <br />GE AEfiAZ BE LiAEK 8 <br /> <br />No person under the age of twelve years is employed in <br />the mine. Strangers or visitors are not allowed underground <br />unless accompanied b; someone familiar with the mine. All <br />accidents have been reported to The Hnreau of Nines. The mine <br />carries Indemnity Insurance against accident in the James <br />tiYilliame Company. <br />This property is worked continnonaly. All drilling is <br />being done rith machine drills. The above machinery is is <br />a frame buildin3 close to the wagon road leading to be. Platter. <br />with 7000 Yeet of four inch air pipe to parry air to the ~tS.ne. <br />