My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00657
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00657
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2009 10:15:29 AM
Creation date
11/18/2007 12:13:27 PM
Metadata
Fields
Template:
Mine Books
County
San Juan
Volume
13
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />-4- <br />not stoxed underground. The average amount oP explosives <br />Kept in storage is ?500 pounds. This is kept in a frame, <br />iron clad magazine at watse dump 30o feet from tunnel por- <br />tal and 50o feet ~*_'t)L9 boarding house and used for this ?~ur- <br />pose only. Sandles, oils and other combustables are stored <br />in the store house. The ~ievire for thawing po~~der is a a <br />steam coil in small magazine, <br />M I N I Ti G A' N'D M I N E M F TH^0 D S. <br />The mine opening is a ernes cut tunnel 500 feet°iri <br />length where it taps the 511ver Lake vein, from this point <br />of intersection the tun~.iel is driven on the sliver Lake vein <br />500 feet, from this point to a cross cut 800,feet to New <br />York vein, Prom this,polnt a drift 400A Peet on the New' <br />York vein. Frcam this point to a crosscut 1500 Peet to <br />i,etter "G" vein and a drift 1000 feet on Letter "n" vein. ' <br />This is the 7th level from the surface levels approxi- <br />mately 150 feet apart. Nature and extent oP other workings <br />are Ynity tunnel crosscuts and drifts on Sily»r i,aka, N»w <br />York and Letter "a" veins, total length approximately 14000 <br />feet, Unite level is No. 11 below surface, intermediate <br />levels every 1.50 feet on all veins, bast Ohance tunnel <br />is 450 feet below Unity,.approxiMat»ly 2700 feet•on New <br />York, silver Lake, Sexanton City tunnel 1500 feet on better <br />"a" vein. work is carried on at present on levels 5, 6 and <br />7, on hetter "G" vein under Titusville -claim west of worked <br />out portions which lies beivween working face and ?rortal. <br />h4aps and drawings axe up to date. <br />II U I S T I N G. <br />Method employed compressed air hoist, to hoist timber <br />and supplies to No. 5 level from NA. 7 level which 1s main <br />level. Men are ra~.sed and lowered ~xi.th holster, skip is <br />used for that purpose, dis+.tznce hoisted 300 feet. <br />Character and condl.ti.on of cable 5~8 steel 1n good shape, <br />beF,n in use fox two months. Safety divices to prevent over <br />winding is a raise 150 .feet higher than highest level <br />worked 3~8 steel Bell line is used 1n good condition. 12" <br />gong belt, state signals are used. A11 persons are prohib- <br />ited Prom riding on loaded sK1p or bucket. <br />
The URL can be used to link to this page
Your browser does not support the video tag.