Laserfiche WebLink
Gross totmage for 20 days, 375. Average tonnage per month, 700. <br />3mplate Total i'eet in shafts, 525. Cost por loot, <br />Total feet in drift 17.00. <br /> s. or .levels, .}00. Cost <br />'Total i'eet in development, 925 pe.r foot, ypG'.00. <br /> . <br />ind airy are Men employed. <br />ris'tims, 6 machine drillmeu, p X4.00 for• 8 h <br /> <br />2 timberynen, our shift. <br /> <br />.e cars are 3.50 ~~ 8 <br />9 trammers, 3.00 ~~ 8 ., n „ <br />~~ u <br /> 11 o,re sorters, 3.00 ~~ 8 ~~ n <br />e is of 3 top men, 3.00 ~~ g <br />3 engineers, ~~ n <br /> 4.00 ~~ <br />2 blacksmith's <br />8 n u <br /> 4 00 ~~ <br />2 foremen, ~~ ~~ <br /> 4.50 ~~ g „ n <br />ans of Average number of men employed, 38, 19 <br />surface underground and 19 <br /> <br />~ <br />. on <br />time. Cost. <br />:quipped Cost of fuel, X5.00 per ton, Averar;e cost <br />Cost of timber <br />.y"22 <br />50 <br />AR per month, X3.5.00. <br /> <br />ble <br />and , <br />. <br />per <br />. Average cost <br />Cost of steel, 9! per lb per month, ~j350.00. <br />, . <br />Cost of oil, 60A! per gal. <br />' <br /> most oi <br />powder, p3.95,~%ive ge cost per mo <br />"upplies are deliv <br />d nth, X167.40. <br /> ere <br />to .the mine. <br />t to ex- Average assay valuo ore a^, <br />per, ton, ~p'i0.00. <br />onnecting Cost <br />Per ton, rninirq; of ors, ?p10.00. <br />• Cost per ton, transporting ore, 80;! by wap•on, and ~p3.00 by R <br />R <br />Cost <br /> . <br />. <br />per ton, treatment oi' or©, 7.25 to N9.00. <br />'ae <br />Ls readily <br />