Laserfiche WebLink
(~ <br />i~ ~lti ~4ri <br />V` -4- <br />S T A T I S T I C S. <br />Gross tonnage 600 tons this year. <br />Total. number of feet in Tunnels 500. Cost par foot 7.00. <br />Total number of feet in drifts 200.Cost per foot 7.00. <br />Total number of feet in cross cuts 200. Cost per foot $lo.oo. <br />Total number of feet in ilevelopement 900. <br />Average assay valea per ton x,125.00. Cost per ton ~Eining <br />of ore.x25.oo. <br />Cost per ton transporting ore ~y35.oo. <br />I1 E N E 1E P L O Y E D. <br />18 Miners <br />6 Ore as:sortera <br />2 Foreman <br />1 Superintendent <br />3.0o for eip~ht hours <br />3.00 " <br />3.00 u u n <br />6.oa " " " <br />GENERAL R EMAR_Y.=. <br />Iio person under thc- age of 12 y•~ar: is employed in the ~11ne. <br />Strangers or visitors err- not rllosve:i under ground unless <br />accompanied by a competent Suide fam111ar vrith the Ltine. <br />All accident: have been reported to the Flurcau or' lrinoo. <br />The management is ::uPPliedwith b1anY, reports, and i:, familiar <br />with the statutes relatin~~ to the operation of metalliferous <br />mines. There are no building3 near the Tunnels. <br />Surface transportation is done by wan on and pack trains. <br />This is anew country and very little more than asneusment <br />worlt bars been done on any of the claim:,. <br />There Ss Vanadium and Uranium Tor twelve miles squar.s, so tar <br />as is known. All that 13 needed Ss a railrlad, then it will <br />be one of the best mining; camps Sn the State of Colorado. <br />