Laserfiche WebLink
DEVF;T,OPML[gT:- srarisrics, <br />Total No.of ft,in shafts <br />1020 Coat per.ft.$20.00 <br />Total fdo,of ft.in drifts <br />1950 Coat per.ft, 6.00 <br />Total P}o:of ft.in cross-cute <br />60 Cost per ft, 7,50 <br />Total fto.of ft.in winzes azid raises 200 Cost <br /> per ft, 10,00 <br />Total hlo.of ft.in development <br />3230 <br />Average ton,-cage per month 500.- <br />h1EN II.9PLOYLfi:- <br />15 miners,.@,$2,75 per daY of 8 hours, <br />. 1 timberman @ $3,50 per day of 8 houra, <br />l trammers @ $2,75 per day of 8 hours, <br />1 ore sorter @ $2,50 per day of 8 hours. <br />2 engineers @ $3.50 per day of 8 houra. <br />1 superintendent. <br />COSTS:- <br />Cost of Coal $5.00 per.ton Average cost per mont}y $75,00 <br />Ceat of timber lagging 30 ets. <br />stulle 11 eta.per inch Boat per month $15,00 <br />Coat of steel 14 eta,per lb. Average cost per month $5.00 <br />Coat of oil 65 ete.per gal. Average cost per month $5,00 <br />Cost of powder 14 eta.per lb. Average cost per month $40,00 <br />Average assay value per ton ore $75.00 smelting aqd $20,00 milling <br />Coat per ton transporting ore $1.?.5 to Black Hawk <br />$O.GO to Dumont. <br />Cost per ton treatment of ore Smelting $7.50 <br />hulling $1.00 <br />,~ <br />