Laserfiche WebLink
i:iU <br />S T A T I S T I C S. <br />PRODUC TI ON <br />Average tonnage per month 50 <br />DEVELOP)dENT <br />Total number of feet in shafts 500 <br />Cost per foot $25. <br />Total number of feet in drifts and levels 2,000 <br />post per foot $9.00 <br />Total number of feet in Dross outs 100 <br />Cost per foot $9.00 <br />Total number of Peet in r~inzea and raises 205 <br />Cost per foot $8.00 <br />Total number o P feet in development 1005. <br />uen emploged: <br />2 maohine drill men 8 hours $4.00 <br />1 timberman " 3.50 <br />2 trammers " 3.00 <br />1 ore sorter " 4.00 <br />1 engineer " 4.00 <br />1 superinten~l.ent " 5.00 <br />Average post of fuel per rronth $55.00 <br />Cost of timbers average per month 20.00 <br />Average post oP steel per month 10,00 <br />Cost of ponder 12-1~2,ots. <br />Average post per month 50,00 <br />Average assay value of ore $10.00 <br />Cost per ton for mining, ore $4.00 <br />Coat per ton for treatment and transportation $b.15 <br />General Remarks. <br />Ali shafts, pits and other excavations are securely <br />covered or fanned. <br />All sooldents have been reported to the Bureau of <br />nines. <br />Nine parries indemnity ineuranoa against apoi- <br />dente in The Ocean Compaq. <br />Yina is not a regular producer; is worked Don <br />tinuousiy. <br />Yariagement is familiar with the statutas relating <br />~ to the operation of metalliferous mines. <br />