Laserfiche WebLink
"~45 <br />S T A T I S T I C S. <br />Oross tonnage could not ascertain; <br />they are now shipoing about 250 tons per month. <br />DEVELOPMRNT: <br />Total number of feet in shafts 650 <br />Cost per foot $30. <br />Total number oP Poet in drifts and levels 2000 <br />Cost per foot X8.00 <br />Total number of feat in cross cuts 400 <br />Coat par foot X8.00 <br />Total number of feat in vrinzas and raisos 300 <br />Coat por toot X7.00 <br />Total number of feet in development 3350 <br />1dEN EMPLOYED: <br />3 maohine drill r.~en 8 hours at $4.00 <br />2 timbermen " '4.00 <br />3 trammera 3.00 <br />1 topman 3.00 <br />1 engineer " 4.00 <br />1 blaokamith " 4.00 <br />1 foreman " 5.00 <br />1 superintendent " 8.50 <br />1 office man " 4.00 <br />Total nwubar ~f mein employed for the year 14. <br />Cost of Puel,$5.40 per ton,averap;a punt per month $150,00 <br />Cost of timbara, average Par rnntylUU.00 <br />Cost of stoel, avoraga per month $25.00 <br />Coat of oil, avera;o Par nn nth X10,00 <br />Cost of powder 12-12 lh. average poet Por nenth X240.00 <br />Average assay value of ore X60.00 <br />Coat for mining; same X5.00 <br />Cost of transportation and treattuent of ore X8.00 <br />