Laserfiche WebLink
1: <br />iii <br />I <br />1~ 6. <br />yyff .• <br />1 <br />'~ <br />• <br />jj <br />1. <br />~~ <br /> <br />S T A T I S T I C S. <br />~~' Average tonnng a per month 1600 <br />;, <br />i; <br />,,, <br />DE9ELOPISEAT: <br />~. <br />I <br />~~ <br />f+ <br />; Total number of feet in shafts 8,800 <br />. <br />!~ Cost: per foot $35. <br />si <br />~~ <br />i <br />Total number of feet in drifts and levels <br />. <br />20,000 <br />l Cost $10"per foot ' <br /> 2,000 <br />~!' Tool =nsimbei~~jr~y~ in cross outs <br /> Cost per foot ;10. <br /> Total number of feet in winzes and raises 1,000 <br /> Cost per ibot X7.00 <br />~' <br />' I Totei number of feet in development 31,800. <br /> <br />1 i <br />i <br />' <br />YEN' ElfF'LOYED: <br />~ 20 Machine drill men 8 hours $ 4.00 <br />;` 5 timbermen a 3.50 <br />;i ~ 20 trsmmers " 3.D0 <br />~4 <br /> ZO ore sorters " 3.00 <br /> 4 top men " 3.50 <br />~ 4 engineers 4.50 <br /> 2 fiz•emeri " 4.00 <br /> 3 blaok»miths 4.50 <br />A <br />~~ 1 foreman " 5,00 <br />'t 1 superintendent ".. 8.50 <br />~- 1 offioe rran " 4.00 <br />I Average number of men employed for tho yea r 71 <br />j <br />~ <br />. COSTS: <br />; <br />~ Cost of fuel $4.5o and X6.25; average oo»t per rbnth $1500. <br />f <br />I~. Cost of timber ten ots, her inch, average per i:,onth $150. <br /> A.veraze cost of »teel per month $100, <br /> Average coat of oil per month $50, <br /> Average co»t of poeder per month $1,000. <br /> Average as»ay value of ore per toil $22. <br />' Cost per ton for mining »eme $12. <br /> Co»t I;er ton for trap»porting and troating saws $6.00 <br />