Laserfiche WebLink
"i 1'/ <br />Chutes are loaded by gravitq, Underground tramming by <br />buckets on truoks,8~ 1~ra11 track,with a trackage of ,4,000` <br />ft. Ventilation is the Worcester system, Pressure maintained. <br />111 workings by a system of doo2•s, Noxious gases are met <br />with, C. O.-,2, Sanitary condition is fair. <br />Shaft is divided into .two ootupartments,and is provided <br />with ladderwaye, which are safe,neoure:and aeoeseible, ~ . <br />arsd have no landings provided; there are wlnzes and manways <br />connecting levels and at least one is kept in repair and <br />equlpped-with ladders. 1[ine h&e more than one ezit,by <br />oonneotion with the Go id King Tunnel and the l[idget mine, <br />and all`are readily aooessible to employee. Lighting <br />underground by electricity and eandlea. <br />S TAT I S T I C S. .. <br />Average tonnage par month 60 _ <br />DEVELOPMENT: <br />Total number of feet in shafts 850 <br />Cost per foot#25 ~ .. <br />Total number of feet in tunnels .400 <br />Cost per tbot $15. <br />Total number of feet in drifts and levels 4000 <br />Cost per toot $l0, - , <br />Total number of feet in Dross outs 1000 <br />cost per foot $l0. <br />Total number of feet in winzes and raises 1500 <br />Coat per foot $s. <br />Total number of feet in development 7,750. <br />3[EN FJAPLOYF;D: <br />1 machine drill man 8 hours =4.00 <br />i trammer • 3.00 <br />1 eng ineer • 4.00 <br />Average number of men employed for the year 8. <br />.Cost of eleotrlo power per month $72. <br />Cost of timbers average per month $20. <br />