Laserfiche WebLink
1 <br />V 1 i1 <br />R)SPORT <br />on the <br />IdOLLI); GIBSOtt r-.nd A. J. JOItiT HILL. <br />Located at Aspcii~ Pitkin County, Colorado. Vested in the Llollie <br />Gibson and Arrentum Juniata Lfinine Company. Principal office at Colorado <br />Springs, Colo. C. E. ?alcer~ Genernl ?latutger~ Colorado Springs, Colo. <br />-rruich office at Aspens Colo. A. J. Cox Supt. Anpen~ Colo. <br />Process, concentrating. 200 tons in 24 hours. <br />The ore is run !n :smtall care to the m111 and dumped into large bins. <br />This Sn a ~oiat mill and the ore from the two nines is treated independently <br />of each otlier~ one halt of the mill to each ffiae. The ore is fed from the <br />bins into two 9 x 16 Wdg~ Crushers arul elevated to two seta of rolls, 1Gx42 <br />and 18x48 in sire. From the rolls it is elevated to two Large storage bins. <br />Over theao bins aro located two automatic samplers ehich sample the ore as <br />!t cones fron tl:e rolls. From the hlns it is fed automatically to seven <br />5-toot [funtin.;ton Liills~ and passes through a0-r,~eah acreens~ and ir. elevated <br />to •,~hat nre Y.nosrn as the brown sizsrs raid distributed to 28 b3•ue Vaimera; <br />from the Va.~u:era It is wheeled in wheel barrows to an automatic dryer and <br />dried Ly steam heat. <br />A Hamilton Corlias Stationary engines 125 horse powers drives the <br />crusher rolla~ elevator and lhintington mills. A Iiuffalo 40 home power <br />engines high apeed~ rune the Frue Va~utera~ dryer and sampling machine. 2 <br />Horizontal 80 horse power boilars~ 9b lbs. pressure. <br />26 men employed. All 8 hours. <br />~gineera $3.26 Hill men $2.76. <br />Crushsr men 2.50 Vanner men ?2.60 sad $3.26. <br />Dryer men 2.50 <br />~. _ <br />/~ <br />is <br />,;. , <br />R • ~ S <br /> <br />t <br />i ~~ <br />i~ <br />