Laserfiche WebLink
Gold Fisou±•e - 4. <br />M Z A I~ G <br />& f3ITIE vuF.THOD S- Contin. <br />~'. <br />'drift in the ald shaft. il shaft 60U' in depth connects with the <br />tunneland is used for an additional exit in case oY necessity. <br />,The old drifts have all bean stoped out to a depth of 500', have <br />'saved in and are abandoned. <br />i <br />Overhand stoping and drifting are the methods employed Yor <br />ore extraction. Ho hand drilling is done and Haugh machine drills <br />',are eaployed. <br />Thetimbars are prepared b; hand from pine and red epruae, <br />Fare in Ysir condition and sufficient in size and musber to in- <br />sure sa3ety. " <br />', Chutes are loaded by hand and gravity. Underground tram- <br />Imi~$ is done with a horse and steel Dare on R trackage of 18" <br />guage and. 2Uy~ T rails. Drainaga is natural. Sanitary conditions <br />'.are good and e11 old timbers and debris have been removed from <br />,underground. <br />A 24-inch BuYYalo fan and li-inch pipe in used to carry air <br />to the upraise. The Yan 1s run with a 5 h.p. Gasoline engine. <br />IIo noxious gases are met with and the ventilation is fairly good. <br />~`arbide lamps are used for lighting tmcierground. <br />S T A T I S T I C S. <br />Average cost oY power per month, y60. <br />Total number oY Yeet in shaYts, e0u. <br />Other measurements not given. <br />L4gn employod: <br />1 Machine Drillmen, 54.00 Yor 8 hour sn1Yt. <br />I 3.50 " '~ <br />1 n Helper, <br />1 Trammer, 5.00 " „ <br />i ,+ <br />5.50 " " '~ <br />1 Blsoksmith, <br />5.00 " <br />1 Superintendent. <br />Average number oY men eaployed *or the year, 5. <br />i I <br />