STATISTICS.
<br />~~Production:-
<br />Avers„o *,onna{,;e per moat':, 7000 tons.
<br />Develonment:-
<br />Total :Io. oi' fr. et. in sirai'ts, 2010, cost per root, (ry"30.00 to5740
<br />Total IJo. of feet in drii'ts attd level: , 10 miles.
<br />Cost per foot 5x6.00 to yp9.00.
<br />Total i1o. oi' feat in rrinzes and raises, tyro miles.
<br />Total 110. of feet in development, 107,G00.
<br />~?en em loyed--LaUor.
<br />100 machine dril].men, 57h.00 for 8 hour shift.
<br />4 to B maci:ir:e helpers, 3.50 " II " "
<br />Gl miners, 3.00 " 6 " "
<br />23 timuer-mer., 3.50 " © ° "
<br />17 Helpers, ;5.00 " 8 " "
<br />55 traruners, 3.00 " 0 "
<br />'u4 ore sorters, 3.00 " © "
<br />106 top men, 3.00 " © " "
<br />3 laUorers, 3.00 " 0 " "
<br />2 assayers, u200. psr !no. for 8 hoar sirii.'t.
<br />5 en; ineers, •?. 00 to =. 50 t'or II hear si:ii't.
<br />6 pumpmen, ?. 50 f'or IIrozzr silii't.
<br />3 i'rrerneu, ;5.50 ° II
<br />9 Ulack:lmiths, 5.00 " © " "
<br />0 i'vremen, 5.00 " © "
<br />1 superirztertlent, Sp300.00 per ;north.
<br />2 office ~iel.n, 51125. to 5f 2'1,5. per °..^.o:~~:~...
<br />2 nippere, Sr;S.00'1'or 6 i:our shift.
<br />1 povrder monlcoy, 5;5.00 f'or 8 hour uhift.
<br />1 surveyor, 5p200. por _~:!atth.
<br />Avery„e nwnUer of !Hen en!.lo, ed 1br tine year, rF50.
<br />Cost.
<br />Cost of fuel, rp•?.00 to 5pG.00 por ton, Averaf;e cost por moriCli,
<br />©,260.00
<br />Cost oi' tir:Uor, lap;151u~, ~40f!, sttzll timUor ?1.00.
<br />Avera~,c cost par mo!!th, Sbl,OlF3.25.
<br />:',applies delivered to mitre.
<br />AvoraUo assay value of ore per ton, 5x20.00
<br />Ora transported ;:y contract.
<br />Cost por ton, treatmaut,,SpG.t35 to 5}9.00.
<br />
|