Laserfiche WebLink
STATISTICS. <br />~~Production:- <br />Avers„o *,onna{,;e per moat':, 7000 tons. <br />Develonment:- <br />Total :Io. oi' fr. et. in sirai'ts, 2010, cost per root, (ry"30.00 to5740 <br />Total IJo. of feet in drii'ts attd level: , 10 miles. <br />Cost per foot 5x6.00 to yp9.00. <br />Total i1o. oi' feat in rrinzes and raises, tyro miles. <br />Total 110. of feet in development, 107,G00. <br />~?en em loyed--LaUor. <br />100 machine dril].men, 57h.00 for 8 hour shift. <br />4 to B maci:ir:e helpers, 3.50 " II " " <br />Gl miners, 3.00 " 6 " " <br />23 timuer-mer., 3.50 " © ° " <br />17 Helpers, ;5.00 " 8 " " <br />55 traruners, 3.00 " 0 " <br />'u4 ore sorters, 3.00 " © " <br />106 top men, 3.00 " © " " <br />3 laUorers, 3.00 " 0 " " <br />2 assayers, u200. psr !no. for 8 hoar sirii.'t. <br />5 en; ineers, •?. 00 to =. 50 t'or II hear si:ii't. <br />6 pumpmen, ?. 50 f'or IIrozzr silii't. <br />3 i'rrerneu, ;5.50 ° II <br />9 Ulack:lmiths, 5.00 " © " " <br />0 i'vremen, 5.00 " © " <br />1 superirztertlent, Sp300.00 per ;north. <br />2 office ~iel.n, 51125. to 5f 2'1,5. per °..^.o:~~:~... <br />2 nippere, Sr;S.00'1'or 6 i:our shift. <br />1 povrder monlcoy, 5;5.00 f'or 8 hour uhift. <br />1 surveyor, 5p200. por _~:!atth. <br />Avery„e nwnUer of !Hen en!.lo, ed 1br tine year, rF50. <br />Cost. <br />Cost of fuel, rp•?.00 to 5pG.00 por ton, Averaf;e cost por moriCli, <br />©,260.00 <br />Cost oi' tir:Uor, lap;151u~, ~40f!, sttzll timUor ?1.00. <br />Avera~,c cost par mo!!th, Sbl,OlF3.25. <br />:',applies delivered to mitre. <br />AvoraUo assay value of ore per ton, 5x20.00 <br />Ora transported ;:y contract. <br />Cost por ton, treatmaut,,SpG.t35 to 5}9.00. <br />