STATISTICS.
<br />Tha avera~•e tonnage per month is 300.
<br />'1'gtal feet in shai'ts, 412. Cost por foot, ~p18:.00.
<br />Total feet in d'rif'ts or ledels,:48p. Cost per root, 10:00.
<br />Total feet in cross cuts, 40. Cost per foot tij10.00.
<br />Total feet in raises, 150. Cost por foot, ?10,.00.
<br />Total feet in development, 1,08?..
<br />8s.machine drillmen,
<br />1 timbermau,
<br />4 trammers,
<br />3 ore sorters,
<br />1 top man,
<br />2 eng;inesrs,
<br />1 blacksmith,
<br />2 foremen,
<br />Pden employed.
<br />O ?4:00 for 8 hour shirt.
<br />3.50 " 8 " "
<br />3.00 n g n n
<br />3.00 n g u n
<br />3.00 " 8 -n u
<br />4.00 n g n u
<br />4.00 " 8 n n
<br />5.00 per day,
<br />Avsrap;e number of men employed for the ,year, 7.2. 7 on surface,
<br />and 15 uuder~round. ,
<br />Cost of fuel, ~~5.75~per ton. Average cost pen month, 400.00.
<br />Cost oi' timber, ~p20.00 per A~4. AveraE;e cost per month, "150.00.
<br />Cast of stool, 9~ per lb, Ave raga cost per month, <"y'L5.00.
<br />Coat oi' oil, 30 to GO cents per gal, Avora~,~e cost per month, 100.00.
<br />Cost of povrder, yy12.70 per curt., Avsrat;o cost per month, ~~G00,00.
<br />Avorage assay vales oi' oro per tun, ;j?.5.00. .
<br />Cost per ton, ml;iin~,; oi' ore, ~p0.00.
<br />Cost por ton, tranaportinL; of ore, 50~ by wagcrz, a;zd 50j! by R.R.
<br />Cost par ton, treatmo;rt oi' are, fp7.00.
<br />
|