Laserfiche WebLink
~. <br />1 ? i ! 'I ~ Empire. Zinc' Ao. 3. <br />1 ~ ; (', _ <br />~ ~`~ e ' m,,ora is not sufficient work done to determine the size oP ~ <br />--- - <br />~~ ~ the ore body at this point. The ore runs Prom 15 to 20 per <br />! j; } <br />.II cent zinc an3 from 2 to 10 per cent leed. <br />~ „~ <br />DEVELOPMENT. <br />The tPilY.eebarre Shaft is 4 ft. by 9 ft. in the olear'and <br />1 i~ 255 Peet deep and is divided into two compartmente,'bP~which <br />~' ~. one is maintained as a man way. The first level ie at a <br />I I I ~ ~ point 180 Peet from the collar and shaft is bulk headed at" <br />I ' ~ this level. A dri°t le driven to the ~outh'from'the shaft <br />' ~` <br />'.n) at this level and.a crosscut from the.drift•Ye•made:to the <br />s1 ;,,,_ , ~ east. A tunnel is driven in a distance of• 550 feet .toward <br />'6 11i', - <br />'"!`~ this shaft.Prom apoint lower on the hill ghich bas's like <br />~. <br />~, '.(~ ' ' <br />i'~:'. distance to go before reaching a point under the shaft. <br />I ~ ~'`' There is about 800 foot of drifting from the shaft. <br />.._,. <br />;;;,., - - <br />. ~'~ i <br />"'' MINE EQUIPMENT. <br />k_ <br />I~ The mine is oquipped with: <br />i, B# rail track and truck for bucket, <br />III ~ I~r <br />~i';I~~' Steel bucket (cap. 1000 pounds', <br />'.'~ir -.~ 8 in. galvanized iron ai;•epipe with torch sucker,~~ ~~' '~ <br />~ r <br />II~° ,jl ~ ~ Head frame made 10' $ 10' timbers, 30 Poet high,- . <br />~ i; , <br />;~~ ;C 38 inch iron shoave whoel, <br />~,il 3/4 inch steel cable (good) <br />~~ i,~I Shaft ie fittod with doors, <br />' i'~ SURFACE EQUIPMENT. <br />1 ~ ,,E <br />i ~ i~! I~' Engine and hoist room (30 foot Pram shafb), <br />;~~ j i~.',~~ ~ ~', ~ Blacksmith eho (e ul od w <br />;;,~ I P q PP ith hand tools) in Enpina roam; <br />~ ' <br />~I .,I~ I 0 <br />"I'~''"" Powdor house (frame iron roof, 200 feet Pram shaft), <br />fl'~ ^, ,~ <br />'!~ '~ <br />;, 30 1i. P. uprip~t boiler (73 - 2 in. fluor) carrying BO to BOA. <br />~ ~ " ~ '. r' i,. <br />~. i~'~ ~i,~ 8x8 - 16 li.P. F,M, friction hoist, , <br />~ ~ Hoist not eauippad with <br />I ~i•~ I',, Ponitivo indicator but oable is marY.e , <br />,~ ';~~ r!, Water ror boiler use and fire protection is florivofl from tho <br />~~~I, ~iy .Iron Mask pipo lino water system. <br />COSTS AND BT'ATIB'1'IC3. <br />i <br />i;l','~,"~~ ~~' .Ooal (9 tonaruesd for month) X8.00 per ton, <br />~( ~ Timbors (elabbod 9 s used) .BS eaoh, <br />Powder (Du Pont 90"/. Golatine) 13.26 per owt. . <br />j I I'.R~i I i Fuse (Monarch) <br />'!;Ij i~ i Labor: •50 por 100 feet. <br />I~ I 9 Minors f9 W3.00 = Q12,00 <br />i 1 Engineer ~ 9.00 = 9,00 <br />i ~L,IIi ~.` 1 Foreman ~ 5.00 = 6.00 <br />~I~I~'I~ Ili'', I ~ mon omp oye a aeon o T'~por day. <br />~ , , I;, ~ <br />., <br />l <br />~L r~tyG __-- <br />oa <br />Filed <br />at. i <br />