Laserfiche WebLink
RE:;DIICTIOfl <br />AORR:3 , <br />On tho- south Bide of Ute Creol: and about 100' north oP <br />the portal of the tunnel is located the 10-statop amalgamating <br />mill belonging to and operated by the owners of this group of <br />mines. The mill building is Framo, oovered with rubberite and <br />2b' x b0' in size. <br />The equippment is as Follows; <br />10 stamps - 36 drops per minute. <br />Sampson crusher. <br />AiFley oonoentrating table. <br />16 h.p. General L~leatrio motor to run stamps. <br />7} h.p. n n n n n OOn06n. table. <br />h•p• n ~~ n n n Ornah6r• .. <br />Power is Furnished by 1;lio Uydro-Eleotrio Company of <br /> <br />i Georgetown, Colorado. <br />Onpaoity of the mill le ?.6 tone every 24 hours and tha <br />mill ie run eatiroly on Company ore. <br />Ore is trammed Froq the tunnel and diunped into the ore <br />bin in the mill. Bros the ore bin it is shoveled Into the <br />orushar and thenoa it is Pod nutomatiaally to the stamps. <br />ji <br />