Laserfiche WebLink
<br />-4- <br />T:e second exit is through upraise to surface, 250 feet <br />from south of tunnel. Jnderground lighting by candles. <br />Total number of feet in shafts 150 <br />cost per foot $50 <br />no. of feet in tunnels 600 <br />cost per foot X10 <br />no, feet in raises 110 <br />cost per foot ~5e <br />Total development 860 j <br />overage ao of men employed for year 2O 1 <br />i <br />lYauea r•mnino from ~3.5o to X5.00 per day of eirht hours. <br />Cost of coal, per ton, ~p6.50 <br />" wood, per cord 3.50 <br />Average assay '~L'1'10 are per ton, Se to a12 <br />Coat per ton o: minim ore X1.25 <br />Cost of concentrating, per ton :j1.00 <br />Smelters charge nothing :or treating ore on account of lead <br />contents. <br />Indec+nity insurance a~*ainst accident is carried in the ~ <br />i <br />London, Liverpool ~ Globe Co. j <br />Send blanks to T. L. IYood, 312 E. 12th Lve.,Lenvcr,Colo. ~ <br />i <br />RF.C0~.11'.NLAT IONS. <br />1. Equip the Snovry i;anr*o tunnel with nafficient doors <br />at a reasonable distance from the entrance so they can be <br />operated from without to prevent obnoxious gases or fumes <br />in case fire should occur in buildings at mouth of tunnel. <br />2. Leop uprai:~e to surface readily accessible to employes , <br />y <br />_......e.~~--- <br />