Laserfiche WebLink
.. . <br />out in shoats and pockets into the limestone. <br />The copper ore averages about 6/ copper and is , <br />shipped to Omaha, while the lead and iron ores are <br />shipped to the emelteB,at Salida. The iron ore rune <br />about 4 ounces per tan in silver and carries about <br />40f excess iron. <br />WORKINGS. <br />The main tunnel is 4x6 1/2 in the alesr and is in <br />a diatfance of 2800 Peet, 300 foot of which le a <br />crass-cut when th@ main contaot was out. <br />A shaft (4x8'two compartment) from the eurfaoe, <br />38b Peet deep connects with the tunnel at n paint <br />~ 1100 feet in. At a paint 136 feet above the tunnel <br />level another level was driven from the shaft a <br />~ dietanoe aP 700 Paet. <br />The main level ie'aonnooted with this level by <br />the shaft and two upraises, all of whiah are oquipped <br />with ladders. At a point 2100 feet in the mnin level <br />a ~yl/2 x 9 double compartment winze is. sunk a depth <br />of 200 Poot with a 300'feet level at 100 feet depth <br />and another at 200 feet deep. Prom theaa levels <br />about 300 feet of orgee'outting hoe been done. <br />~ EQUIPfiLNT. <br />Tho shaft la equipped with abaft houao and while. <br />! 'The winze is oquipped with u geared hol.et driven <br />~ by a 16 H.P. Ltotor, a bower which is driven by a <br />3 II,P, Motor and whioh furnishes ventilation for the <br />winze through an 8 igoh gnlvanized pipe, bath <br />I <br />j motors era G.lr: type. <br />~ Tho tunnel la oquipped with n 3 drill Gardner <br />oomprossor driven by a 36 If.P, G,~. motor (80 ey „ <br />220 vans, 37,6 Amp.), a ?,xA ft, air reaeivor and <br />I ono Layner, o»a Waugh and ohs 9ullivnn drill, <br />Tho rails nrs 12 lb, and the aara are 10 ou.ft, <br />I <br />i onpsaity. Tho tunnel is also equipped with electric <br />lights and mind phones and the oars are hnuled by mules. <br />