Laserfiche WebLink
STATISTICS. <br />Production:- <br />dveral^e tonuaf;e per rnont~, ?.500. <br />Develop!.rout :- <br />Total muaber of i'eet in s'rta~t, 3120, cost ]:per foot, ~~G0.00. <br />Total number of i'eet in turmel or ad its, about 2Fi0. <br />Total numpiber of feet ir: drifts or levels, 3000. <br />Cost per ibot, x10.00 <br />Total number of i'eet in rrinzos ar!d raises, 3,000. <br />Total number of i'eet ii: development, 3,000. <br />Labor; ;nen om-~loged. <br />30 miners, y3.00 for 6 hour shift. <br />4 .t imUe rmten, 3.50 " " " . " <br />~ trarnn!ers, 3.00 „ 6 „ " <br />10 ore sorters, 3.00 " 8 " " <br />7, top men, 3.00 " d " " <br />2 ns;:a!;ere, t"150.00 a!xi <br />j <br />' ~y7fi.00 per mmrth resnect.ively. <br />2 e:x~;ir.eera ? <br />3.75 i <br />or 8 hoar shift. <br />1 puc;pman, 3.75 " A " " <br />3 firemen, 3.00 " S " " <br />1 L•lachsmj.th, 4.00 " 9 <br />1 teamster, 3.00 . <br />2 forerr!eu, 5.00 " 8 " " <br />1 oi'1'ice :~:elp, ?x100.00 per moath. <br />1 Rapt, 2.'.5.00 nor e!ont_=. <br />12 millmen, ?"3.00 ]tf;r dt ey. <br />electrician, F~3.75, for ].2 }tour s'~.11't. <br />AVe rape :n~n~ar oi' rren er.!. luyed i'or the year, 105. <br />Cost:- <br />Cost oi' fuei, ;17.00 per ton, nvera~e cost per month, ;p3,500.00 <br />Cost of timber, X17.00 nor Prt. rvaral.;e cost par mm~tth, X800.00 <br />Cost trans;~orti.nf; suppli^-a to mine, ;j..5.00 per ton. <br />Averap;e away value oro pox ton y"t3.00. (of crude or©). <br />Cost per ton, transnortirp; oro, ~~5.00 <br />Cost per ten, trentmsnt of ore, ?u7.00 <br />