My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00520
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00520
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2009 9:11:46 AM
Creation date
11/18/2007 12:08:51 PM
Metadata
Fields
Template:
Mine Books
County
Boulder
Document
Manager
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r F ,c a:,, y.--r, l <br />prooess hot air and chlorine :gas are introduoed, under pressux•e', <br />which penetrates the ore en masse and further digests it. Rfter <br />which i,,.,, ;r; .,, , ,,.. <br />t is elevated and conveyed into large open tanks wxth <br />porous filter, and aub~eoted to a chlorination leaching with a <br />solvent whlch is manufactured by the eleotrolysis of salt solution <br />~ 8 gh the ore <br />on standard lines and whioh, after percolatin throu <br />is x•oturned to elootrio oells where the Values which have boon <br />dissolved by the colution are precipitated out by eleotrolysis <br />and oollected and refined by ordinary methods. Tho solution <br />is rot set set of oe11s ra~enarated and used over <br />urned to the fi , <br />again. ~ The prooess being a continoua one and the solvent being <br />constantly regenerated and ]cept to stand strength. <br />The following description will servo to give some idea of <br />the size and oharaotor of the plant. Tha same will be insope/r- <br />ation within 80 days, and have an immediate capaoity of 126 tons <br />per day, tivith a crushing aapaoity of 300 tons per day. It is <br />hoped by this prooess to handle the low grade telluride and sul- <br />phide ores of Boulder county, which, at present, are not profit- <br />able on aooount of excessive transportation and treatment ohargas. <br />Tha aocompanying illustration gives some idea of vrhat <br />the external appoaranoo of the now mill will bo. <br />Tho flrat large building shotim is the laaohing room and <br />is 80x300 feet; the ono in the road, for prooipitating, is 25x200 <br />foatM the next ono in the road is the regonerating buildings 20x180 <br />foot. Tho furnaoo pit shown on the loft of the out ie solid <br />masonary, fifty foot square and seventy-five foot high, and in- <br />alosas the oooling pit where the hot ores are proparad for the <br />loaohing. ~ <br />The orushing aapaoity of the mill, 200 tons par day, is <br />furnished by three sots of monster roils 16x~4P inohea. Tha oruaher <br />waigha 38,000 pounds. Tho ore is dried in two stool towers fifty <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.