Laserfiche WebLink
<br />STATISTICS, <br />Average torutage per month, 572. <br />Total feot in shafts, about 5,000. Cost per foot ~p50.00. <br />Total feet in drifts or levals, about 5 miles. Cost per foot, }rG.00 <br />Total feet in cross cuts, G,000, Cost per foot, X6,00. <br />Total feet in winzes and raises 1,000. Cost per foot X5.00. <br />Total feet 1n development, 7 lr2 miles. <br /> ?J.'en employed. <br /> 1G machine drillmen, ~~ X4.00 for f3 hour shift <br /> <br />.4. miners., <br />3.00 " . <br />8 ^ n <br /> 5 timbermen, 3.50 " p '~ n <br /> 12 trammers, 3.00 ^ 8 " '~ <br /> 7 ore sorters, 3.00 " 0 " '~ <br /> 19oss ore sorter, 4,00 " £3 " „ <br />- 2 top men, 3.00 " 8 " n . <br /> 3 firemen, 4.00 " E3 ^ " <br /> 2 blacJcsmiths, 4.00 " 8 " " <br /> 1 helper, 3.50 " 8 " " <br /> 2 foremen, 4.50 " 8 " " <br /> 4 engineers, 5~`p4.00 and ,"p4.50' 4 " " <br /> 1 Supt. }7.50.00 per month, <br /> 1 oi'fice help, 150.00 per month. <br /> 6 watchmen, X3.00. <br /> Average number of men emplb~~ed for the year, 6G. 39 underground <br /> and 27 on surface. <br /> Cost. <br /> Cosb of fuel, .~~6.00 per to n. Average c ost per month, ,x`1,000. <br /> Cost of ti~yrber, 21.50 per ?R. Average cost per montrt 5p149.14. <br /> Cost of oil, 40f! per gal. Average cast per month, ?50.00. <br /> Cost of povrder ~yl'7..22 per cwt. Avorage cost per month, f~633.20, <br /> Average assay value ors pe r tort, ,~`p30.0 0. <br /> Cost per ton, transporting ore, 55;! by waF;on. <br /> Cost per ton, treatmertt oi' ore, y~7.25 including R.R.. charp;es. <br />, BIld <br />employed, <br />ey is <br />•ad un- <br />lod for <br />with <br />sitaf t <br />is 3,000 <br /> <br />iron, ~ <br />a build- <br />powder. <br />