My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00514
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00514
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2009 9:47:48 AM
Creation date
11/18/2007 12:08:36 PM
Metadata
Fields
Template:
Mine Books
County
San Juan
Document
Manager
Suffix
B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- G - <br />Lulls in Operation. <br />Silver Ledge Idill. <br />Qn the Silver Ledge Group of Liinea, near Chattanooga, in the Red Lfowitain <br />oeaed by the blmira Lf. & 11. Co., of which J. B. Warner io itanager. <br />Tnis is a concentration mill, employing crusher, rolls, jigs, revolving <br />ns, recrushing tailings vrith stamps and concentrate on double deck 1'tilfley <br />a; GO tons daily capacity. Ore handled contains a lead and xinc brae, pro- <br />,~ lead and zinc coneentratea; the latter being Held for more favorable market. <br />~e ntmber of men employed in mine and mill, 40. <br />Hercules Lfill. <br />Ovrned by the Hercules Consolidated Inning Company, of which Thoo. fi. Kane, <br />verton, is Lianager. This mill is operated on the ores produced from the <br />ovned by the Hercules Cor.. L1lning Co., located on Sultan Lountain, near <br />'ton, Colo. <br />Capitalisation, 50,000 shares of $10.00 par value, eachg E. P. RicY.er, <br />nt, 175 Devonshire St., Boston, ilass. <br />The mill is located within 1000 feet of t]!e Boston tiuuiel, one of the main <br />sorkit~ levels of the mines, with which the mill ie connected by a double tract. <br />elevated tramway. i'he mine ie also within 450 feet of the Enterprise tunnel, with <br />vhich the mill is coxuieoted wit} She same style oP tram as above described, and o <br />over wliidi ttie ore is delivered into the mill automatically. <br />Capacity of mill, 125 tons per day. It ie a concentrator employing one <br />9x 15 Flake crusher, tvo eats of Cornish rolls, 14 z 27, elevators, three re- <br />volving acreenax sit Hartz jigs, two hydraulic eizera. The above constitutes the <br />mc]iinery used in the first concentration of the ore. In the aeconcl section of <br />! ~~ <br />~, I..n <br />I'• ry. <br />1 <br />~~~ ~ , <br />~, <br />~1 i I•~ i <br />l i_ •I <br />+' <br />`~ <br />'ll ~i <br />i,~ ~' <br />~ ~~, ~ ~}~ <br />I' Ja <br />~; <br />~~ <br />~= ~ ,~ <br />I. <br />i <br />i ~ <br />I <br />i~l <br />~~ <br />'ii I <br />~I`° A <br /> <br />~ i f <br />{ ~. a, <br />,' I~.1 <br />i~ ~, :. <br />I. '~ r <br />U <br />i ~i <br />'i <br />~.~ 1 <br />~! <br />~, <br />~ ~.. . <br />r, "' <br />~ ~, <br />f ~~ ~~I~ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.