My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00502
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2009 9:29:00 AM
Creation date
11/18/2007 12:08:04 PM
Metadata
Fields
Template:
Mine Books
County
Lake
Volume
10
Document
Inspectr
Suffix
C
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
jC~ NIN ING : <br />The property is developed by a vertical abaft 8 X 6,two compart- <br />~, 8~~, <br />R C' ments,cribbed with 4 X 8 cribbing and is 350 ft deep. - <br />~' !~ ', <br />>;i! P.ork is carried on at present time on bottom level 340 ft from <br />~. {; . <br />b ! ii . - - ' <br />.' <br />1 surface drifting on ore, maps and drawings at offico. ' <br />j The hoisting method employed is bucket. '±en are raised and lower- <br />I `i <br />!' ~~- ed with hoiatir~g machinery weight of load hoisted 1,000 lba.dis- <br />~il, <br />~~: <br />! 'I; tance hoisted 340 ft, The cable is steel wire 3~4ths in good con <br />j. <br />m <br />dition,cable has been in use six months, Hook used on end of ca- <br />' i <br />~i <br />:a <br />;I. <br />-ii <br />',i <br />!;; <br />a~ <br />,; <br />i? <br />:~ <br />;y <br />?~ <br />;: <br />;. <br />,~ <br />;;•; <br />l1'I <br />;,; <br />;:' <br />,~. ,. <br />~! <br />~,, <br />~J <br />I! <br />i, <br />i ~ } <br />~" <br />f ~{ <br />I.~. <br />ble is chain hook,the same being in use six months. <br />There are no devices employed to prevent over~rinding, nfaterial <br />is hoisted from one level. The bell line is of 3~Stha hemp rope and <br />i <br />good. The state code of signals is posted in the engine room,nt <br />collar of shaft and at each level station,. All persons are pro- ' <br />hfbitod from riding on loaded bucket,thia order is posted at col- <br />lar of shaft, The bucket is filled at chute,trammed to shaft and <br />hooked in chain hook. There is but one opening ~t all level sta- i <br />tions,a_All level stations are provided with guard rails, ', <br />The shaft is secured with pillar of ground on each side sufficient ' <br />to ensure safety, All winzes or mill bolos are covered or our- <br />rounded with guard rails. The shaft is not being sunk, <br />Power house 40 ft southwest of shaft, The method of ore extrac- <br />tion is that of drifting and over-hand atoping with single hand <br />drills. The timbering method is that of drift sets and cribs,suf- <br />ficient. The timbers used are white apruoo prepared at mill and <br />are good. The loadind chutes employed are of 3-itr. plank with <br />Wooden slide gates, Undsr ground tramming is done by manual labor <br />with steel bucket and truck. <br />Trackage 18 in. guage 8 lb rails, <br />Amount of water dealt with in gala. per minute maximum 10 gals. <br />System employed bailor. A'ater is bailed out Query other day. <br />The ventillation is natural and by fan, The air is good,nox&oua gsa <br />ea are not met with, Sanitary conditions are <br />good, i <br />The shaft is divided into two oompartmrnta,bucket way and man way <br />The maa way is provided with ladders,the ladders are aafe,aecure <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.