Laserfiche WebLink
~ <br />I <br />! ;d I.N I N G (Continuedl. <br />,;} <br />it <br />~ <br />,:~; <br />¢ All tivinzes or mill holes are securely covered or surrounded with <br />, <br />i <br />~ guard rails. The shaft. is not being sunk. <br />~! <br />1 <br />i~ <br />The shaft house is over collar of shaft. The method of mining is <br />I <br />^ drifting with single-hand drilling. The timbering method is drift <br /> <br />i <br />;' <br />abta,sufficient. The timbers used are white spruce prepared at <br /> <br />I <br />mill and are in good condition. <br /> The underground tramming is done by manual labor with steel mine <br />I; <br />cars. Trackage 18 in. gunge 8 lb rails. <br />,; <br /> <br />~r ~~entilletion is natural and sufficient. Idoxious gases aro not met <br /> with. sanitary conditions are good, ', <br />u <br />All old timbers have been removed from underground workings where- <br />~ ~ <br />f ~t ver necessary. The shaft is divided intwo compartments,cage wuy j <br />'! and man way; the man way is provided with ladders the ladders are <br />1' .,f safe,secure and accessible. Landi.nga are provided in man way not <br />': <br />to exceed 20 ft apart. The mine has but one exit for employee, <br />~. <br /> main opening only. r^,xit is roadily accessible for employees. Light- <br /> <br />„~ ing underground by candles. <br /> ,. ' r <br />I'i <br />S T A T I S T I C S <br /> <br />i <br /> I': Development, <br />~ <br />I <br /> <br />! ; <br />';~i Total number ft in shaft 400 ft <br />~ ~', Total number ft in drifts or levels 375 ft <br /> <br />I <br /> <br />~ <br />Total• number <br />! ~~~ <br />ft in cross-cuts <br />40 ft <br /> <br />j <br />I , <br />~;i Total number <br />fk in development work <br />815 ft <br />i : I' .den employed, <br />~. <br /> ~! 3 idinera at 53.00 per day of 8 hours <br />'i L Engineer " $4.00 " <br />I Coat, <br /> i Cost of fuel per ton ;5.75 <br /> ;1 Average coat <br />I fuel per month $45.00 <br /> ~ <br />~ Averago coat timber per month $35.00 <br /> u <br /> 6d Average cost steel per month $5,00 <br /> y Average coat oil per month $1.50 <br /> Average coat <br />. powder per month <br />$64.00 <br /> <br />