Laserfiche WebLink
%IN INS. <br />r ~. <br />~i;. The proporty is developed by a vertical shaft 3-1~2 X 5,one com- <br />~~ I "' <br />I"~ partment,cribbed with 3 X 8 cribbing and 215 ft deep. <br />~. Ydork is carriod on at present time on second and bottom levels, <br />•, <br />1. <br />I' drifting and over-hand stoping. ;daps and drawings at office. <br />~ ,~ <br /> <br />' <br />The hoisting is done with bucket. ]ien are raised and lowered with <br />s <br />hoisting machinery. :eight of load ,hoisted 1000 lba,dist~zzce <br />1, hoisted 215 ft. <br />L , <br />r <br />'"' <br />,! <br /> <br />The cable is 3~4ths in. of crucible steel and in good condition. <br />~, <br />F <br />Cable has been in use one year. Chain hook is used on end of cable <br />4 the same was changed one yoar ago. <br />'~ <br />I' <br />' Thero are no devices provided to prevent overwinding. <br />~ <br />. <br />I <br />r I <br /> <br />?laterial is hoisted from two levels. The !yell line is of A~Stha <br />I <br />I j <br />F' <br />hemp rope and in good condition. <br />j,-; The state code of signals is posted in engine room,at.collar of ~ <br /> shaft and at -each level station. j <br /> <br />' <br />~ All persons are prohibited from riding on ]oaded bucket,thia order' <br />. <br />i <br />j ,1' <br />is posted at collar of shaft. <br />•~ <br />I <br />Bucket and trucY, is used in mino~tY.o same is filled at chute~tram- <br /> med to abaft and hooked.•:in ch~in.hook. ~ <br />~~'I There is but one opening at all level stations. <br />All level sta~ione are provided with guard rails. <br />! The shaft is secured by pil7.ar of ground sufficient to ensure <br />j <br />j i safety. All winzes or mill holes are covored or surrouttded with <br />!i guard rails. The shaft is not being sunk, <br />1 The power house is 30 ft south of shaft. <br />The timbering method is that of drift sets,combination sets snd <br />solid cribs, timbering is insufficient. <br />The method of ore extraction isthat of drifting and ovsr-hand sto- <br />I ping with single-hand drilling. <br />' The timbers used are white spruce propared at mill and is good <br />l <br />The loading chutes are of 3-in. plank with wooden slide gates. <br />Underground tramming is done by manual labor with steel bucket and <br />truck. <br />