Laserfiche WebLink
-3- <br />.~ <br />~I i ~!j+i <br />,.~ ,i-l~ <br />~i 1! <br />i ~ <br />;'f ~l 'I, <br />I ~7, }}{{ <br />' y ,l <br />f~, <br />4 <br />~~ <br />'I, <br />,~ ~ I;~ <br />z <br />~;I~ i~: <br />r ~~ '; <br />!~ i ~I I <br />i;"i <br />;,~,, <br />I~. <br />~ ' ~; <br />:Ir~~ <br />i' <br />.1 :~:. <br />' •' ~;~ ~• <br />i <br />yjf''~;ji <br />~,~, ~ <br />:,~r'. <br />~~~ I I' <br />,,~i <br />''t' •i <br />'II~~ 1 <br />~. <br />,_, ! ~ <br />i l: <br />?,~r ' ~ <br />~,,!F f , <br />r r,E <br />~r <br />a, <br />;~ , <br />t <br />i <br />~':~ <br />liquors. There is no shaft hoaae•arid all hoists are under <br />ground. The collsr of the shift is of sufficiont height to <br />prevent persons from tripping or falling into the shafts. <br />The cellar of the shaft i; provided with sufficient doors <br />to prevent material from fzt7,11ng into shaft. The engine room, <br />s-orlt shaft, blacksmith shop and f-~rnace room are 500 feet <br />fro:~+. entrar.r.~, One Office, one boarding house about 200 <br />feet Eros Tunnel, Company store and ore bins. <br />Electricity is used for lighting. Surface transportation is <br />done by Railroad, wagon and train. A• 16000 foot Aerial <br />wire rope tramway i; used to carry ore froW Eine to D:I111. <br />The :r:ethod of ore treatment is amalgamation, concentration <br />anc electric cenaration. <br />E X P L O S I V E S, <br />4C ,°:' 1Tapont Fo::der. C,L.~ae and wooden tamping bars, <br />All ereess poFrder is stored in a dug out with a tight roof <br />about 300 feet from ;;orl:inr shaft. About a car load of <br />por;dcr is stored th%:rein. 6 steam thaFrer is used for tha•.v- <br />inr po,:de~•, I;o co:.;bnrtibies are stored xith the powder. <br />h: I ti I i_ A ci ~ 1_: I 1\' E _1 E P]I 0 D =, <br />The ^.:ain onenin;; i:; a Tunnel on ;Io. 1 level on the vein. <br />Thic is where •^orl: is carried on aL the present time. <br />,h; hci::t is operated by electricity end air. About One ton <br />Ss %,cisted 4„ a time for a distac:ce cf about 300 feet. <br />Tl:e c^ble is in rood condition havir,~ been in use only sir. <br />months. 1aterial i;; heisted for more than one level. <br />A Cagier is employed to look after the cage. An eloctric <br />bell and push buttons are used Frith Colorsdo Code Signals. <br />b code of signals_ are posted in the Engine room at collar <br />of :;haft and at each level station, All persons are yrohib- <br />ited fror: riding on loadeu Cade, An orler ty_ this effect <br />io posted at Collar of shaft. All ._ level stations are provid- <br />ed vrith._ Passe;-e ways around urorking shaft. 'I'Iro stations are <br />also provided •sith guard rails, The Tunnel is provided ~.~ith <br />~uf'ficient doors. Tt:e method of ore extraction is over hand <br />stopir;,^, ~..ith ingersol sergeant and wa ;gh drills. <br />h'et:^.od of ±i.mberi:rg is stalls and natural arches,Character of <br />timber; spr:ce. These are prepartld by hand. <br />