Laserfiche WebLink
-4- <br />546 <br />Average assay value 10.00 per ton. <br />Cost of mining ore $3.00 per ton. <br />cost of ore treatment per ton $z.00 <br />MEN FM PL OYEP. <br />3 machine drillaen 4.00 for 8 hours <br />1 machine helper 3.50 " <br />1 timberman 4.OC " <br />2. tracers 3.50 " <br />2 topmen .3.00 ° <br />1 assayer 5.00 " <br />1 engineer 4.00 " <br />1 blacksmith 4.50 " <br />1 foreman 6.00 " <br />3 millmen 4•C~ " <br />GENERAL R~'iSARK S. <br />No person under the aEe of twei~~e .'ears is emplo~red in <br />the miSle. Strangers or visitors are not allowed under- <br />~r~~u'ld unless accompanied by a guide. Ail accidents have <br />been reported to the Hlxreau of Dines. The mine carries <br />lndemnlty insurance against ~ecidert in the London Guar- <br />antee Co. The mine has a mill consiflting of ten stamps <br />on. Blake crusher, two nari'E rs, one "'ilfle}~ table and <br />one Overstom. The mine is a regular producer and is work- <br />ed continusly. <br /> <br />