Laserfiche WebLink
E. , <br />M: <br /> <br />~i I ~S- <br />~. <br />Ilie s;~ Engineer. Surface transportation is done by Pack train. <br />~~i E~ <br />i <br />-°! ~ E%PLOSI VES. <br />'' ;~ <br />!JL 40° Dupont, German fuse and wooden tamping bars are used. + <br />' .~~ <br />'~-• All excess powder is stored in a Magazine several hundred <br />i' <br />feet from other buildings. About one ton Ss stored there- <br />in. Device for• thawing powder is a double hot water boiler. <br />~: <br />'' l1L I N I& G A P D Z: I N E M E T H O D S. <br />The r.,ain opening is a Tunnel. ":ork is carried ..n at the <br />~i <br />present time 300 feet from surface. yfen are not raised <br />~ or lowered r•ith hoi:,tir_ <br />g machinery. Averahe weight <br />heieted 60G lbs. P.iatance hoisted 700 foot. Tho cable is <br />ir. mood c-,ndit.ion being replaced about two .months ago, <br />A bucket hook is used on end of cable. This is about <br />two months old, Gtate code is used in sigr:aling. Theae <br />are posted near collar of shaft. All persons are pruhibited <br />from riding on loaded cage. All level stations are provic:- <br />ed v:ith passage nay around shaft. The shaft is provided with <br />Guard rails. A door is placed a sufficior_t distance in Prom <br />entrance of tunnel to prevent admission of gases or fumes, <br />The method of ore extraction is slopes and piston machines. <br />The method of timtering is stalls and aquaee sets. <br />Timbfrs are pine and spruce prepared by hand. Underground <br />tramming is done by mules. <br />The system of ventilation is natural. The shaft is divided <br />into two compartments, ono •for ladder other for bucket. <br />Lardi.r~s in ladderway are 16 feet a part. All levels are <br />connected. Tho 2iine has three exile by means of Tunnels <br />runnir~ to surface. Electricity Ss used for lighting under- <br />ground. <br />TAT 1 _ T I C S. <br />Average tonna$e par month 200. Cost of timber .10~ per foot. <br />''~, Cost of <br />powder ,16~ par lb, <br />'~'•' Oost transporting su lie~• <br />;~ pp ~ to Line X2.50 per ton. <br />f~~ Cost of Mining ore <br />',~-~ ~1C.oc per ton. <br />r... <br />r <br />.... • . <br />h <br />