My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00494
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00494
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2009 9:44:37 AM
Creation date
11/18/2007 12:07:52 PM
Metadata
Fields
Template:
Mine Books
County
San Juan
Volume
14
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~I <br />R <br />' id <br />h <br />qI;~,I <br />;h„~~ <br />le.~; <br />i ;~ <br />'~ <br />',; i', <br />.,,k `~ <br />~. <br />r~~'~ <br />~I;;!rr . <br />-~ <br />MI NI N 6 AND MZ NE METH 0 DS. <br />The main tunnel is 2000 Peet long in one tYte Buffalo <br />Boy vei_•1. There is also a tunnel on the Old Abe about <br />420 feet long. The nature•of other-workings are, two <br />winzes from RufPttle Boy tunnel (51 and 26 feet) deep <br />and three raises 200', 65' and 100 feet respectively. <br />~?ork is cerried on at the present time in the main tunnel <br />and up on the Lei-71. The hoist is run bq electricity. - <br />About• 600 pounds are hoisted at one time for a distance <br />of 30 feet. A nen 5~8 inch cable iF being used which <br />has only bean used three months. A pull bell is used in <br />signaling with the Colorado code. No person 1a allowed <br />to• ride on loaded cage. No signals have beep posted yet. <br />The cage is loaded by shovel. The winces have not as yet <br />been provided •,~it2: guard rails. The tunnel is 2000 Peet <br />long and about 150 feet out to surface Prom the main <br />2000 foot drift. The bunk house, drS•ing room, ?'ltchen, <br />store room and ci!ange room are at entrance of tunnel. <br />The mine ifi not provided r^ith doors. There is no ore <br />being taken o-~t. ~t the present time, the nark being done <br />iF all dewelopement works by hand drilling. <br />The method of tlm~~ering Ss sccare sets. The timber is <br />pine 10 to 12 inches thick. Under~ound tramming is <br />by hand. The .^>;•at.em of vent.liation is a raise to surface <br />and en electric operated blower. The ladders are cafe <br />secure ~.nct accessible. The mine has more than one exit. <br />one through tunnel and other through raise to surface. <br />Electricity iF ueec.for lighting underground. <br />S T A T I S T I C S. <br />Total number of feet in tunnels 2500 cost per Pt. X11. <br />Total number oP feet lri dri~te 2500 cost per ft. X11. <br />Total number of feet lri cross-cute 100 coat .per ft. #11. <br />Total number of ft in raises 490, cost per Pt. 12.50 <br />Total number of feet in develapement 3100. <br />Cost of fuel X11. per ton. <br />Cost of timber {F.50 for 10 sticks. <br />,, <br />
The URL can be used to link to this page
Your browser does not support the video tag.