Laserfiche WebLink
<br /> <br />Addison - 5. <br />~IH1.p.G..~~;;MIAE METHODS-Contin. <br />~.:iTimbering,'veatilation and sanitary='oonditona are=good• <br />and suiYioient:~%pater.in the mine;is~hoiated'by means'~oY•a "'~= <br />bucket and the quantity is too small'to cause any material'' <br />inconvenience. IInderground-tramming is done by hand with steel <br />buckets and steel trollies on a trackage of l8" gt~ge and~8~ <br />T rails. _ ~ ' <br />S TAT 13 T I C S. <br />,. ,,. <br />'Grose tonnage, --- °- . <br />Averagc tonnage Per month. 10. ' <br />_ Averago-aseay`value~ore per ton, $200. ' <br />Cost per ton transporting ore, $2.60. ' <br />Cost per .ton treatment smelting'ore, $6.60. ' <br />Cost oY gasoline per day, 30¢. <br />Cost of pov~der~per month. $14. <br />~ Cost of oil per month, $z.~• <br />,~, <br />Cost oP timber per month.-nothing at proseat. <br />., <br />" " n <br />Coat of steel per momth,- <br />- Total numbor of toot in shnite, 100. <br />„ n n ~~ ^ ttu'-11o1e, 608. <br />. " " u_ " " dritts. 06. <br />]den employed; <br />~2 ltinere~ $3.00 toz 0 hour shift. ' <br />4.00 " " " " <br />1 Engineer, <br />1 Bleokamlth~ 3.60 " " " <br />1 Superiatendeat~ 4.00 " " " " <br />Averags aunbor of pea employed for the yeas, 6. <br />- <br />aE3fP.aAL AEYdx~B <br />•Shese hays been ao accidents to seport to the Bnroan of <br />ItiAea, '!hs msageeaAt is anpplied wltb blank aooideat seposts.~ <br />{ <br />^' <br />adds <br />the <br />neo <br />or <br />and <br />min <br />eoo <br />is <br />t <br />I <br />