My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00452
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00452
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2009 12:41:22 PM
Creation date
11/18/2007 12:07:00 PM
Metadata
Fields
Template:
Mine Books
County
Teller
Volume
6
Document
Inspectr
Suffix
G
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ..STATISTICS. <br />Development:- <br />Total number of feet in shafts, 200.0. Cost, per foot, 30.00 <br />Total S1o, of feet in drifts or l evels, 2000. <br />Cost per foot, ~p10.00 <br />Total lTo, of feat in crinzc,s and raises, G00. <br />Labor:- No. em;-Toyed. <br />1 mac;iine drillman, ~y4.00 for 6 hour shift. <br />9 miners, 3.00 " 8 n n <br />1 ore sorter, 3.00 " 13. . " <br />1 engineer, 4.00 " 4 " " <br />1 Supt. 6.00 <br />Average PTo. of men e mployed for the year, 1:5. <br />Cost:- <br />Cast of fuel, 57.00 per ton,. Average cost per rnonth, fp12S.00 <br />Cost of timber 22.00 ner P.R. Avcra~;•e cost per month, uG0.00 <br />Supplies delivered to mine. <br />Cost per L-on, transporting ore, x1.75. <br />Cost per tou, treatment of ore, N7.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.