Laserfiche WebLink
-3- <br />The surface plant consists of blacksmith shop 12 x i4, ore <br />sorting house where the ore is .sorted. and .sacked 16 x 2A <br />the above buildings are at the tunnel entrance. A11 other <br />buildings are about.20fl0 feet Prom tunnel, then consist' <br />of one office 16 x 24, boarding house 18, x 36, i~unk house <br />16 x 24 and stable 8 x 10, <br />E R P L O S I y E S. <br />Kind and grade of explosives used 4,00 Nitro Glycerine giant. <br />Character .of :?use 7L, caps 5-x and woodAn tamping bars are <br />used. r~Xplosives in excess of one dsy's.supply are not <br />stored underground. The average amount of eaplo,sves <br />kept in starf~ge is 500, stored in a dry tunnel about <br />200 .feet west from main tunnel and used for this purpose <br />only, Candles are stored i?i.a store roam at boarding <br />hnUSe, device for thaMing powder is a double hot water <br />boiler heated by candles, <br />}d~~ .& I ,N G A N P M I N !~ M 'P R 0 It, S, <br />Nature and extend of main openings are,thleee tunnels <br />known as ~ 1, 2 & 3 this is wh~sre work is being carried <br />on. There is from 600 t© B00 feet of work in eatsh tunnel, <br />it is worked in rooms-witch posts fo-r timbers and f~11ed ~` <br />with waste rock as the ore is taken out, Method of timber- <br />ing is square sets in drifts and tunnels covered with <br />lagging,.. Tho timbers are spruoe and pine, prepared by hand, ~, <br />Underground tramming is. done. by hand. The system of <br />ventilation is natural, the tun~;ela have raises through <br />to surface,,0andles axe used. for lighting underground. <br />Each ,tunnel has two Axits in ease of fire, air shafts have <br />ladders with landing every 20 feel, there is one dooms at <br />each tunnel. <br />k <br />C 0 S T <br />Total number of feet in raises 240 cost per foot.-$8,.00 '. <br />Tot a1, #~t~ber of feet in tunnels ~ drii'ts 2000. cost-per foot X8,¢0 <br />Costa of ooal ner t~i'1 ~8t50 <br />Cost of bribers per month 2.5.00 <br />Cost of steel per month 5,00 <br />Cost of powder, fuse and caps pex~<asonth60.00 <br />Cost of transporting suprlies to mine X50,00 per month. <br />