Laserfiche WebLink
<br />b~ti <br />deep. Shaft on Biook 13, is 4 X 8, 300 ft, deep <br />and cribbed with 3 R 8ta Work is being carried on <br />_ at pre.aent time in main shaft. Mine has maps and <br />drawings of the workings. <br />HOISTIHO~ steam hoist with skips; weight of load <br />hoisted 4,000 ibs. a distanne of 100 ft. Cable 5" X 3~8 <br />_ flat cable; has been in use ten years. hooks used at <br />end oP able clamps, acme were changad 30 days ago, skips <br />are equippad with bonnet and safety oluthhes, which are <br />tested once a week. The AKron 3afaty hoox is used to <br />prevent overwinding; ore is hoisted from 5 levels; <br />skip tender is employed. Bell line 3~8" steel cable <br />with an electric bell system. State code of signals <br />are employed and ie ~~osted in angina room at Dollar <br />of shaft and in each level station; all persons are <br />prohibited from rlding on loaded skips and this order <br />is posted at Dollar of shaft. Notice is posted stating <br />the maximut6 rnxmber of men ~ermitte9 to ride in skip <br />at one time, at collar of shaft and ePOh level station. <br />oars of ore are dumped into aKip; no safety aPPlianoe; <br />page guides 4 X 4 Oregon pine; all level atatioi~s are <br />provided with passageway around ••vorking shaft; guard <br />rail are provided at„all stations; shaft is seoured with <br />pillars of ground on, each side sufficient to insure <br />safety; all winzea and mill holes ara coverad cr sur- <br />rounded with guard rail8; abaft is not being ~rznk; <br />MITE y[ETGOD, over hand filled btopea. Piston and <br />Hammer drills are employed,as +rell 8s single hand. <br />Timbering by atulle and lagging,and is sufficient, <br />timbers are native spruoe end pine,in thair natural <br />state. Condition of timbers fair. Chutes are loaded <br />by gravity and by hand. Underground tramming bl' steel <br />oars on 8~ T.ra11 traok; traokage 52,000 ft. Ventilation <br />