Laserfiche WebLink
ra i z z , <br />At the mouth of the Burleigh tunnel, a 100 ton <br />concentrating plant, is in the course of erection. Plan ~1 <br />being to crush, elevate to screens, i re-crush with `~ <br />~•g, <br />~~. <br />Huntingtona, and treat with tab lea. Y <br />i <br />It is the purpose of the company, to treat all ~ j <br />of the old filling, or waste material in the stopes, for <br />the purpose of recovering the zinc product, together with <br />zinc and lead values, rihich it contains. Complete descrip- <br />;; <br />i <br />tion of P4i11, Trill be~given on completion of same. ~~ ~ <br />REC OIdP~NDAT I ONS . <br />rr^irst, Secure r~iooden tamping bars, and <br />insist on their usage. <br />Second. Secure suitable powder thawer. <br />Third. Do not store more than one days <br />supply of powder underground, <br />Fourth. Repair timbering where necessary, and <br />make secure all places in ::orkings on <br />Bosmarek vein. <br />Five, place guard rails in shafts on all <br />level stations, <br />Sixth, place guard rails, or covering over <br />all winzes. <br />