Laserfiche WebLink
o <br />L. <br />'eery <br />aia <br />0 <br />-'~: <br />[e <br />end <br />V`E~NT I CATION 115 ' <br />S . <br />Syetam employed Connections on levels 2_3-4-5 and.6 with ~~ <br />E1 Paeo, Old Gold and other workings <br />... .i t,r :,. .ul .. - <br />Suffioieat ae_there are no noxious geese met~with ~~ _ <br />SAKI TRAY CONDIR I ON3 ;~ <br />All old timbers hava~not been retroved trom.undergrouadworkiage <br />EK I T S - '- <br />Tha shaft ie divided into two compartments and ie providad~ <br />with laddenway. .The ladders are^eaoure~and aoceseible <br />and the ladder-way oontains air~plpee. <br />Landinge•ara not provided in ladderway not to exceed 20 foot <br />apart. ~ The ladders are straight from one level to <br />another ""-~ <br />ITharo are winaee and man-ways.aonneoting levale• V~ <br />The mina has more than one exist for employee, same being <br />from the C K. d N Shatt that the E1 Paso Workings <br />on levale 4 + 5 ~ an <br />d 9 <br />',.Is exit readily aooeseible to amployee4• .Only by means of ropes <br />~7 ..: <br />L I G H T: I H 6 U N D E R G A O U N. D I <br />Syetam employed is Candlae and Carbide Lamps <br />8 T A T I S T I C 8 PRODUCTION <br />~IGross Toanaga Unnble~to~get same <br />. _ ,. <br />DEVELOPMENT <br />Taal number of feet in dhafte 889. Coet.per toot about $30.00 <br />Total number ot~teet•ia drifts or levele~ 5720 Coet per toot <br />about $7.00 ~ . <br />~~Total n~ber of foot in orosa-outs 1337 Cost per toot <br />i ' <br />about $7.00 <br />Total number of feet in winaee and raioep 1160 Coat per toot <br />about $7.00 <br />Total number of feet in development 9106 .,. <br />MRN EMPLOYED LABOR <br />No• Employed. <br />8 Maohine Drillmen, $4.00 for 8 hour •hitt <br />3 Trammsre, $3.00. fdr 8 hour shift <br />1 Engineer, $4.00 for B hour ehilt <br />lverage number of men employed for the year about 6 <br />COST <br />'oat of fuel $4.25 per ton Average soot per month $75.00 <br />