My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00418
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00418
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2009 12:30:25 PM
Creation date
11/18/2007 12:05:57 PM
Metadata
Fields
Template:
Mine Books
County
Teller
Volume
17
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />' D~YEL.OPYEBT <br />~. .,I .. <br />1!, ; Total number of feet in shafts 1000 Coet per foot $30.0 0 <br /> <br />P Total number of feet in drift or levels <br /> •35000_ Cost:per toot $.T.0 0 <br /> Total number of foot in cross out• to $10 00 <br /> I <br />, ~ Total number of feat is winzee and raises 195D Coat par foot $lO.O D <br />~~,' Totul.nnmber of feet in development 37,950 <br />~ ~ MES •EMPLOYED LABOR <br />~ Ho.~Employed. <br />~, ~ 4 Y3chiae Drillmea, $4.00 for 8 hour shift <br />1 I _ _ _ <br />3 Traa®ers, $3.00 for 8 hour shift <br />', i.;, I ; <br />1 Engineer, $4.00 for .B hour shift <br />~~,I,, Blsoksmithing done by the engineer <br />~;: .. - .. <br />~, I <br />, <br />~I <br />Li:11!_d !I!' C 0 S T <br />iti <br />, <br />I ~P <br />~; Coat of fuel $5.65 per toe Average coat per month $100.00 <br />!'~!` 'i; Coet of steel 9 C Average coat per month $ 10.00 <br />~, l <br />~~; i, ~~ ~ .. ~ , <br />Coat of oil 65 ~ Average coat pier month $ 10 ~00 <br />i~: i',~' 'I <br />.!' j l Coet of powder 14 Average ooet par month $150.00 <br />I v~ I~ <br />I Average assay value ore par ton $35.00 <br />I~` I Coat par ton mining of ore $3.00 <br />ij. ~ <br />I'1~: q <br />~~ <br />I <br />~ Coat per toe transporting ore Included in treatment rates <br /> <br />C <br />, <br />;i oat per toe treatment of ore $4.00 to $5.00 <br />r'f~~~ <br />~I ~ <br />, <br />' G E E E R A L <br />A E M A R K S <br />~ ~? j; Ara all ehnfte, pits or other excavations on the property <br />~i., . ,' ~' eacuroly covered or fanoadT Ro <br />fl , ~~ <br />~ ; <br />~ Ara strangers or visitors alloned under ground unacoompaAied by <br />~,. pdI" owner or employe dsputiaed'to aooompany themt ~Ho <br />~ <br />, ~'"! Hava all acoidente been reported to the Buroau of lfiaeet <br /> <br />1 <br />``I <br />~~ iy '; Nave had none ` <br /> <br />~I ~I~'. <br />1 Hae mine management blank acoldent raportaT Do ~~ <br />;I~; <br />; ~ r <br />Ipf Does mina carry indemnity Saeµranos against acoldentT Eo <br />~ <br />~ ~ !I <br />~ i ~' <br />I <br />I <br />Does mine carry socident for employeeT Ho <br />ra;! <br />I~I~i}}'I Ie mine a re lar roducerf Ho <br />P <br />~ <br />~ <br />~~~ ~ ~ , <br />,. <br />Is property worked oontinuelyT Yea <br />i~i~d;'! <br />I~, it ; Ie management familiar with statutes rolatin to the o oration <br />S P <br />, ~ <br />u of matalliferouo adaesP Yba ~ ' <br />1 <br />~~'~,,~~ Band binnke~ p.Qjq,a~, <br />li~ '~ <br />l Ie property sub-leased t Tee <br />~~,Il~ <br />i <br />~ <br />~~ It so, state aonditione, eto The Royalty is from 12 to 22 per Dent <br />'illy <br />' ~ and tho <br />- ableeseee pay from 5 to lOp{r Dent inaleae• <br />
The URL can be used to link to this page
Your browser does not support the video tag.