Laserfiche WebLink
STATISTICS. ~ <br />Bred <br /> DE9ELOPB'D~T. <br /> Total fto. ft. in shafts 17b coat per ft. X17,50 <br />up~~raiae ~• .• .. adita 249 ,. „ „ 6.00 <br />Lighting .~ .. .. drifts or levels 907 „ 6,80 <br /> „ „ winzes & raises 670 <br />,f f, 9, 8,00 <br /> „ development 2001 <br />MEN EMPLOYED. <br />2 miners X3,00 per day for 8 hour shift. <br />1 Supt, b,00 „ <br />C 0 S T S, <br />Timber, 13 eta, per inch, Av. cost per month, X20,00 <br />Powder, 14 cta, per lb. „ 2U,U0 <br />Average essay value per ton ore 31,70 <br />Cost per ton mining of ore, 3,80 <br />Cost per ton transporting ore, to R. R. 1,15 <br />„ „ „ „ „ Blaokhawk to Denver 1,60 <br />„ treatment of ors, <br /> Smelting at Denver, 7.00 <br /> „ Golden, 5.60 <br /> Concentrating 1,60 <br />