My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00378
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2009 2:17:20 PM
Creation date
11/18/2007 12:04:45 PM
Metadata
Fields
Template:
Mine Books
County
Gilpin
Volume
6
Document
Inspectr
Suffix
D
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' STATISTICS. <br />Total~~tlo.:of~foet dn: shafta, ~ - 1435 _ Av. coat per.ft,. $50.00 _~ <br />Total`No.of"feet:~iit~ 'driftn,~, ~ 24G3 ~-, Av. eoet per.Ft. 7.50, <br />Total No.of feet in crosscuts 260 Av. cost per.ft. lO.Op <br />Total klo:of feero~'in~ rad6eat .. -, 50. - Av. cont~~ por;ft.: _~., G:00. <br />T>otal`tdo,of'feet in_ developtnent: ~ ' :4238 ~. ,. .. <br />(Note-thin includes only that portion opened up at present and takes xxo account <br />.of any'of~ the~old`workixtgs'.). ~, <br /> <br />2 maohine men(drill) $3,00 per.day of 9 .hours <br />2 machine ]telpers 2.75 per day of 9 hours. <br />7 miners 2.75 per.day of 9 hours. <br />2 timbermen. 3.00 per day of 9 hours. <br />2 trnndners. 2,75 per.day of 9 hours. <br />1 top ,.a,x. 2.50 per.dap of 9 hours. <br />2 enginoera 3.00 per.day of 19 hours. <br />2 firemen 2.75 per.day of 12 hours. <br />1 blacksmith 3.00 per.day of 9 hours. <br />2 foremen 3.50 per.day of 9 hottra. <br />1 superintendent. <br />2 mill aten 3.00 por.day of 1 2 hours. <br />Average tlo.of men employed 2G <br />COSTS- <br />Coal $5.50 per.ton delivered. <br />Timber 10 eto.per.inch~lGl longthatlagging 15 etd.apiece. <br />"ateol 12 otn.por,lb. <br />Povrder 13 eta.por.lb. <br />Average annoy valuo of oro par ton not abtainoci. <br />Trctnnporting ore to rail road fi0 ci;n.per.ton. <br />Coot of oro treatment at amaltaral$7.00 per ton on. ore and Freo treatment on <br />oonoantrates, 6111.1 ing $9.00 por.cord (9 toad). <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.