Laserfiche WebLink
r,~~ <br />(2) <br />length by two upraise 230 feet in height,there is about 15,000 <br />feat of drifting done on the property,tto buildings at the porgy <br />tal of tunnels. <br />Mina methods, <br />Stoping and drifting ie the method employed-Maohine drills are <br />used-Waugh,Ingersoll~Rand make-Timbering,drift setts and atulla <br />aufflolent,Ordinary mine~chutee used-Tramming by men with oars, <br />Traokage-16 ib.to the yard-Vent ilation,natural draft-euffioient <br />No water handled.Lighting underground-Eleotrioity and oandlae. <br />Statistios, <br />Average tonnage par month:-3500.-Oros tonnage per year;-40,000 <br />Coat. <br />Total No.oP feet~in tunnels:1E000.-goat per Foot:-$24,00. <br />" " " " " UPralae:-460. " " " :-lP,00. <br />n n n n n levaja:-150.000, " n n ;_#g,00. <br />Total No.of feet in deVeloPembnt:~?191.000. <br />1(en employed. <br />6 ldaohine drillmen. #3.50. par day. 8 hour shift, <br />2 I[inere. #3.25. " " B " " <br />3 Timbermen. #3.50• ~ " <br />I2 Trammera. #3.00. " " 6 " " <br />2 Hleoksmiths. $3.25• " " 8 " " <br />I Foreman. 65.00. " ~~ " <br />I Foreman. j6, 00. " " N " " <br />2 Laborcr.e. $3,00. " " g n .. <br />I l~fill Btipt, 66.00. " " R " " <br />TO if111 men. 63.75• n u u u u <br />Average No. of men employed for the yeor;-afo. <br />Ooot, <br />Average essay value oP oro por ton-#2?':00:. <br />Coot per ton mining oro:-#2.50. ' <br />" " " transporting ore;~E.75• <br />" " " treatment-#7.o0, <br />Oeneral,remsrks. <br />5amo ss report OP IgII' <br /> <br /> <br />