My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00366
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00366
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2009 12:06:12 PM
Creation date
11/18/2007 12:04:23 PM
Metadata
Fields
Template:
Mine Books
County
Teller
Volume
16
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
..far -wi. ~5,'4~ ~ =•F <br />r G Qr y ~ ~" ~6 =. - t a x-„y ~L ''~ weae.v+, <br />~ <br />~ <br />~ <br />~ <br />~.;_ -~ e <br />"2'A. <br />.. - Y y~i <br /> _{fi <br />- <br /> <br />- `~ <br />j <br />:;~ <br /> <br />T I T L E i <br />Yested in The Ophir Yining Company incorgpratedunder <br />the laws of the state of Colorado, with a capital stock oP <br />700,000 shares of the par value of $1.00 each <br />Principal office located at Colorado springs, Colo. <br />Duncan Chiam, president, 405 Mining Exchange Bldg, Colorado <br />springs, Colo. <br />Leased to The Crown Point Go1d~Yining Company, <br />Carndufi & Duncan, Victor, Colo, <br />Ali fully reported in 1913, except: I <br />8 T A T I S T I C 3 <br />Average tonnage per month 650 i' <br />DEVELOPMENT. <br />Total number of feet in shafts 1,900 <br />Cost per Poot #35.00 <br />Total number of Peet in drifts and levels 2,670 '~ <br />Cost ier.Poot #12.00 <br />Total number of Peet Sn cross cuts 3,500 <br />Cost per Poot #10.00 <br />Total number of Peet in winzee and raises 2,350 <br />Cost per foot #lO,DA <br />,Total number of feet in development 12,420 <br />i <br />E6 EMPLOYED: <br />5 machine drill men 8rhours a.50 <br />2 timbermen r 3.50 <br />2 trammera r 3.50 <br />2 ore sorters r 3.50 <br />2 topmen r 4,00 <br />1 engineer r 5.00 <br />2 foremen <br />.veraae number of men employed for the year 16 <br />C08T8: <br />Cost oP fuel #7.00 per ton, average coat per month #160.00 <br />Average cost of timbers per month #40.00 <br />Average cost of powder per month #250.00 <br />Average assay value of ore per ton #20.00 <br />Coat per ton Por mining same #8.00 <br />Cost per ton for transportation and treatment #6.60 <br />(}EgENAL xEMnxKS. <br />i,Ali shafts,pits and other excavations on property securely <br />(covered or Fenced. <br />1 accidents have been reported to tna Bureau of Mines. <br />ins carries indermlroaucer a acisiworlced continuouslyt Co. <br />ins is a regular p <br />eratieontofsmetalliterouahmineaStatutes relating to the <br />-`~ <br />;1 <br />i <br />,: ~~ <br />I <br />j <br />I^ <br />
The URL can be used to link to this page
Your browser does not support the video tag.