My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00366
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00366
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2009 12:06:12 PM
Creation date
11/18/2007 12:04:23 PM
Metadata
Fields
Template:
Mine Books
County
Teller
Volume
16
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I' ~~ <br />~~ I <br /> <br />TITLE ~~+ <br />~f+i <br />1~PSteda.in The Mary Cashen Mines Company, organized under i <br />~ <br /> <br />I , <br />the laws of the state of Colorado, with a capital stock of !~' ' <br />' <br />l-,800,000 shares of the par value of 11.00 each. ', <br />'~ 1 ~ ,~ <br />I <br />Principal off ice located at Colorado springs, Colo. j! <br />'J, Arthur Connell, President, Colorado springs, Colo, 11 <br />geared to J, F. Hallaron, Victor, Colo. <br />All fully reported 1n 1912, except: <br />STATISTI CS. '' <br />Tonnage none <br />F <br />~~' <br />f <br />~ <br />DEVELOP1dENT , <br /># <br />~~ " r <br />'Total number of Peet In shafts 1,020 ~ <br />iIt I <br />~ <br />' <br />Cost per foot #30.00 it <br />j . <br />1 <br />Total number of feet in drifts and levels 7,000 ~ <br />'i. <br />Coat per foot 12.00 <br />; <br />f <br /> <br />~TOtal number of feet in cross cute. lss~ , <br />, <br />~,,; Y ,1 <br />Coat per foot #14.00 ' <br /> <br />Total number of feet in winzes and raises X00 ~' <br />' <br />+I ~ ' <br />Coat per Soot 16.00 ~ <br />,:~ gni <br />Total number of feet in development 10,420 <br />MAN I1SPg.0YED. <br />1 zoaCnine drill man 8 nouns 4100 <br />ry.00 <br />1 trammer r 4.00 <br />1 engineer <br />jhverage ntum~er of men employed for year 3 <br />COSTB: er month <br />cost of eiectricty ~85•~ P <br />Cost of timbers #l0average costriper month X130.00 <br />Cost of powder 13~ <br />Average assay value of ore #20.00 <br />Cost per ton for mining same #6.00 <br />Cost for transportation and treatment X6.00 <br />~ General Remarks. <br />All syla,fts, pits and other excavations on property securely <br />Covered or fenced. orted to the Bureau of Mines <br />All accidents nave bee urance of any ltlna <br />M1ne~doe8 not carry ~ rodtiaer but is worred continuously. <br />Managementtis iamiliarpwltri the statute relating to the <br />operation of metalliferous mines. <br />-='- <br />--- T -- <br />_- <br />
The URL can be used to link to this page
Your browser does not support the video tag.