Laserfiche WebLink
T I T L E <br />Vestedlin The Henry Adney Gold ![lasing Company, incorporated <br />under the laws of the state oP Wyoming wlth a capital stocaF <br />of 1,500,000 shares shares oP the par value of #1,00 eacri. <br />principal office located at i~~+0 North Dearborn'St: ChicaRO., <br />I11:°'~ <br />Branch office at Cripple Creek, Colo. <br />J.J: Darnell, 2[ar. Cripple Creek, Colo. <br />All 21111y reported in 191; axcent: <br />STAT ISTICS. <br />Average tonnage per month 60 <br />D E V E L O P M E N T. <br />Total number of feet #n shafts 2,300 <br />Cost per foot #25, <br />Total number oP feet in drl2ts and levels 5,860 <br />Cost per Soot #9.00 <br />Total number of feet itl cross cute 3:,860 <br />Cost per foot t10. <br />Total number of feet In wlnzes ar.3 rakes 5,90Q <br />Cost per foot X10. 17,929 <br />Total number of feet 1n development <br />MEDT Ep[PLOYED: <br />4 machine drill men nours <br />S 4.00 <br />1 tirrberman r <br />r 3.50 <br />00 <br />3-' <br />k-trammers r . <br />00 <br />3 <br />1 ore sorter ^ . <br />3.00 <br />1 tos,m2A r 00 <br />4 <br />1 enRineex r . <br />00 <br />4 <br />l blacYSmith r . <br />5, 00 <br />1 foreIDan r 4.00 <br />1 office maA r 3.00 <br />1 watchman <br />A~reraRe number of men employed for the year <br />16 <br />COSTS: <br />Coat of fuel.#5.15 per ton; averaQS cost per month X125. <br />.average cost per month for timbers #~ ! 35. <br />Average cost of steeleTemontht~2515. <br />leverage cost o! oil p <br />Cost or .rowder 13-1/2yS average coat per month X275. <br />Average assay value oS ore per ton #60.00 <br />Coat per ton for mining same ;6.00 <br />Cost per ton for transDOrtatlori and treatment #8.~ <br />GEDTERAL RE"dARKB. <br />pll sYiatte,pits and otuer excavations on ~ro~erty securely <br />aovere4 or fenced. <br />Miaeaiaia regulareproducerpand 1et~orkedBCOntinuouslyas. <br />~erationtofsmetalliferoue mfneagtatutes relating to the <br />I <br />~. <br />