Laserfiche WebLink
T I T Z E <br />Vested:~i~n The Granite Gold Mining Company,, incorporates: <br />,under the laws of the state of Wyoming with a capital stock <br />,2,750,000 shares par value of one dollar each,. <br />Pri3~cipal office located at Colorado springs, Colo. <br />:BYanch office at Cheyenne, Wyoming. <br />..Charles j~geih, President, Colorado springs,~Colo, <br />C,B, Barnettt. Sec & Treas; Colorado springs, Colo. <br />partially 3eases in Blocks, ' <br />All fully reported in Report of. 1912, except, ' <br />statistics. <br />Average_tonnage per month,1500 <br />DEV~EZOPd4ffiT, . <br />Total ztutpber of feet in shafts 3,860 <br />cost per foot #30. <br />f Peet in drifts and levels 21,860 <br />Total member o <br />_ <br />Cost per foot #10,00 <br />'Total number of feet in cross cuts 4,840 <br />'.Cost perrSoot #10. <br />xotal 2uimber of feet Sn winzea and raises 1,680 <br />.Cost per foot #7;00 <br />Total nu~er of feet in development 32,0 <br />~ PT6PI.07CED' g nou ns 4.00 <br />22 machine dr 111 men r.. 3;, 00 <br />a6 miners r 3.50 <br />5 ti~ermen r 3,00 <br />12 ore sort era r 3,00 <br />'18 trammera r 3.50 <br />5• topmen r 4.50 <br />4. engineers r 3.50 <br />1 fireman r 4._50 <br />4 blacksmitBs r 5,00 <br />3: Soreman r 8.50 <br />1 superintendent r 4.00 <br />1 off ice man <br />'TGt21 number of men elaployed on average for year 90 <br />,COSTS. <br />Coat of fuel, #3.75 and Crested Butte at #2.25, <br />',Average cost per montri #1500.00 <br />',Average cost of timber per month #150.00 <br />;Average cost of steel per month #100.00 <br />,Average cost of oil per month #50 00 <br />:Average cost of powder per month ~1 000.00 <br />;Average assay value of ore per ton 22.00 <br />Ifiverage cost per. ton for mining ore #12.00 <br />