Laserfiche WebLink
Principal office located at Cripple Creek, Colo. <br />H.L, Shepherd, President, B os 72, Cripple Creek, Colo. <br />Leased to A1, Campbells Cripple Creek, Colo.. <br />$ T A T Z S T I C S <br />Average tonnage per month 485 <br />DEVELOPMES T. <br />Total number of feet In shafts <br />~~st per foot #25.~ <br />Total r_uu~er of feet in tunnels and edits <br />cost per foot #15.00 <br />Total number of feet in drifts an4 levels <br />Coat per Soot #6.00 <br />Total number of feet in cross cute <br />Coat per foot #6.00 <br />Total number of Peet in win2es and raises <br />coat per Soot #15.00 <br />TDtai number of feet in development <br />YEW E6[PLOYEll: <br />riil men <br />8 hrur~ <br />3.50 <br />2 ti~ermen <br />b traramers " <br />" 3.00 <br />3.00 <br />6 ore sorters 3.00 <br />1 topman ~ ~+. 50 <br />1 engineer r 4,00 <br />1 blacksmith <br />1 eupexintendent salary " 3,00 <br />1 watchman <br />Average number of men eu~ployed for the year 26 <br />COSTii; <br />Average cost of fuel per month #210.00 <br />Average coat of timbers per montri #60.00 <br />Powder average cost per month #381.00 <br />Average assay value of ore per ton #16.00 <br />Cost per ton for mining ore #6.00 <br />Cost of transportingore per ton #2.00 <br />Cost per ton for treatment of ore #5.00 <br />OEWL~RAL REdfARKf3. <br />5,850 <br />1, 0001 <br />33,880 <br />12,000 <br />950 <br />53,680 <br />A11 shafts, pits and otrier excavations on property securely <br />coYereA~ or tented <br />A11 accidents have been reported to the Bureau of brines <br />1[ine 1era1regular produceruandcisiworkedTCOnti~nuouslyQ~ Co. <br />p~e~$~~~nto~s~ta111.feroushmineastatute relating to the <br />