My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00366
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00366
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2009 12:06:12 PM
Creation date
11/18/2007 12:04:23 PM
Metadata
Fields
Template:
Mine Books
County
Teller
Volume
16
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />T I T L E <br />Vested in The A,~ax Gold Mining Company, incorporated under <br />the laws of the at ate of Colorado, with a capital stock of <br />1,250,000 shares of the par value of $1,00 each. <br />Principal office located at Denver, Colo. <br />Branch off ice located at Victor, Colo. <br />Bun Colburn, Gen, Mgr. Victor, Colo. <br />All fully reported Sn 1912, except: <br />S T A T I S T I C S, <br />Total number o f feet in shafts <br />Coat per foot $33,00 <br />Total number of feet in drifts and levels <br />Cost per foot $9,00 <br />Total number of feet in cross cuts <br />Cost per foot $10.00 <br />Total number of feet in winzes and raises <br />Cost per foot $12.00 <br />Total number of feet in development <br />PRODUCTION: <br />Average tonnage per month 4,000 <br />MEN EE~LOYED: <br />16 machine drill men <br />l0 miners <br />Ss tiv~ermen <br />20 trammers <br />11 ore sorters <br />2 to Amen <br />~-: laborers <br />1 assayer <br />1 engineer <br />2 engineere~ etc <br />1 fireman <br />l blacksmith <br />2 foremen <br />1 superintendent <br />2 office men <br />Cyanide plant on ground see mill rapor . <br />s hours $ 4.00 <br />4800 <br />10200 <br />6300 <br />920 <br />22,220 <br />r 3,00 <br />'~ 3.50 <br />r 3,00 <br /> 3,00 <br />r 3,00 <br />•~ 3.00 <br /> 5,00 <br />r 5.00 <br />~ 4, 00 & ~:. 50 <br />~~ 3.50 <br />~ 4.00 <br />r 4.50 <br />~ 10.00 <br />r 3.50 <br />Average number of men employed for the year 92 <br />COSTt3: <br />Coat of fuel $5.00 par ton; average cost per month $1000.00• <br />Average cost of timbers per month $250.00 <br />Average Cost of steel per month $50.00 <br />Average cost of oli per month $20.00 <br />Cost of powder 13~¢ average cost per month $1500.00 <br />Coat per ton for minin8 ore $3.00 <br />Coat per ton for transportation and treatment $5.00 <br />Average assay value of ore per ton $16.00 <br />GENF~{AL HEIQARKB. <br />A11 snafta,pits and oti~er excavatlons on iproperty securely <br />coveredt or fenced <br />All a.ocidente have been reported to tY~e Bureau oP A61nea <br />Mine carries insurance against accidents in The London Guaran- <br />tee Company also carrieslo easance for empioyaes in satt~a <br />company. rate chaxgroducer and is workealcontlnuously <br />Mine is a regular p <br />Management 1s familiar wltn the statutes relating to trie opena.- <br />Lion of metalliferous mines. t <br />r <br />t <br />
The URL can be used to link to this page
Your browser does not support the video tag.