Laserfiche WebLink
ui.: '~rf 9 4~.. _ <br />(3, - <br />~ Timbering. <br />ttethod employed aette,and atulle,auffiolent,Native timber is <br />used,prepared at mine,oondition of timber is good, ordinary <br />i <br />-. _ , _ <br />;:: <br />mine ohutee are used. <br />Traimning°ia done by men end horaes,oara used are ordinary mine <br />pattern,traotage is I2 ib.to the yard rail. <br />Ventilation is by natural draft from conneotiona,no noxious <br />i geese ere met with <br />All old timbers have been removed where neoeeeary, <br />1; Lighting underground is by Dandles and oil. <br />~ Production. <br />Average tonnage per month: 300.Orosa tonnage per year:-3600. <br />Total lfo.ot test in tunnele:3500.COat per foot:-$16, <br />r r + • drifts. 2000. r r r $g. <br />• r r r raises. 250 r r a $7, <br /> r r r r developeunent :-5750. <br /> 1(en employed. <br />2 Yaohine drillmen $w.00. per daY. g hour shift <br />~, 22 f[inare. - <br />$3.25• r <br />r <br />g r <br />r <br />I Tir~berman. <br />r <br />$~i.00. <br />• <br />g r <br />r <br /> <br />I <br />Engineer. ^ <br />$4.00. r g r r <br />I Toreman. <br />r <br />$~i.00. <br />r <br />g r <br />r <br /> <br />I <br />SuDerintendeat. r <br />i7~00. r g r r <br />Average No.ot eon ectploYed for the Year:- 27. <br />C ost of ooal yer ton:-15-00• Average ooet yer month:-4150• <br /> • r t~~;-`P2 per I000 feet. <br /> r r powder;-I4 Dents per pound. <br />Average uaay value of ore per ton:-120• <br />Cost per ton of mining ore:-~I:5o• <br />• r • treataerit end treight,Yer ton:-ig• <br />ulna Oalrya 123da19T11tY 1na~'~e° against ecoident in PidelitY 8 <br />CaatultY oomp~'lY• <br />7liris is s retular proyloer,anG rorKOd oontiuourlY•All acoidunte <br />have been reyoa'ted to the guseau of Kinee. <br />~j <br />fi <br />'1 <br />ii <br />~; <br />lA <br />i. <br />t <br />