My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00356
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00356
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2009 12:03:50 PM
Creation date
11/18/2007 12:04:02 PM
Metadata
Fields
Template:
Mine Books
County
Teller
Volume
14
Document
Inspectr
Suffix
C
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"/ bl <br />Cara are dumped direct into skip. Cage guides are <br />II 4 A 6 Oregon pine in good condition; shaft et all <br />stations is provided with guard rails and is secured <br />~ by pillars of ground on sash side auffioient to insure <br />safety ; all winzea and mill holes are covered or surrounddd <br />with guard rails. <br />Hine methods, overhand, filled stopea. Machine drills are <br />employed, Waugh, Sergeant ~ Ingersoll; some hand drilling. <br />Timberi*~ ~,~ stulla and legg ing; timbers used native <br />spntoe and pine, condition ie good. Chutes era loaded by <br />gravity. Underground tramming,by Data and 8~ 1~-rail track <br />and about 7,000 ft, of trackage. Ventilation by a system <br />of doors and sir pressure and is auffioient. Noxious <br />gases are meG with, nature of same Carbon Dioxide. <br />Sanitary condition fair. Shaft la divided into two <br />compartments and is provided with ladderwaye dhloh are <br />safe, secure and aooesaible,and landings are provided not <br />to eXOeed 20 ft apart; there are some winzea And manwaya <br />connecting levels end at least one Sa Kept in repair and <br />equipped with ladders. Mine has more than one exit for <br />employee;through the Gold Hill Tunnel and the Conundrum <br />mine,and ell are readily aooeaaible to employee; lighting <br />underground by candles. <br />S T /+ T I S T I C S. <br />Average tonnage Per iuonth 200. <br />DEVELOPMENT: <br />Total number of 1'e et in shafts <br />cost net foot ~?.5. <br />Total number of Peet in drifts and levels <br />Co et per foot X12. <br />Total number of feet in Dross outs <br />Coat per foot $12. <br />Total number of feet in winaee and raises <br />Cost per foot ~9. <br />Total number of feet in development <br />1800 <br />25,000 <br />10,000 <br />600 <br />s~,soo ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.